Remove Kitchen Cabinets and Patch a Vinyl Floor Tile
Kitchen Phase 1 Makeover: Opening Up, Painting, and Prep
Sherry’s junk drawer switcheroo was just the beginning of our kitchen makeover — the start of what we’re calling Phase 1. After giving ourselves a six-month “live with it” period to be sure we wanted changes, we finally began putting plans into motion. Phase 1 focuses on making the most of the existing kitchen: keeping the cabinets, countertops, vinyl floor, paneling, and ceiling beams while refreshing the space. Down the road we’ll consider a more invasive Phase 2 once we’ve saved up and decided which elements are worth keeping and which need to go.

Below are a couple of reference shots of the kitchen as it looks now and as it used to look from a different angle — yes, the photo with the stockings and tree is one of our rarer angles of this room:


Phase 1 Goals and Scope
Phase 1 has a number of tasks, so it’s not a one-weekend job. We’ll tackle items over time as budget and energy allow. The main objectives are to open the space to the dining room, brighten the dark paneling, improve ventilation and appliances, and add functional storage and seating with an island. Here’s our working list:
Remove woodstove insert from the fireplace— donePrime and paint fireplace— done- Remove the desk area to the right of the oven to make room for a wide doorway into the dining room (we’ll be adding an island so a desk is redundant)
- Prime and paint the dark paneling
- Open a double-wide doorway between the kitchen and dining room (this will line up with the dining room window for visual balance; we’ll hire a pro and get a permit)
- Replace the low-hanging microwave over the cooktop with a proper hood (the current microwave isn’t to code and sends steam into the kitchen)
- Replace the wall oven with a wall oven + microwave combo
- Prime and paint the cabinets
- Redo the backsplash
- Update the lighting (goodbye fluorescent fixtures)
- Add an island with plenty of storage and seating where the current kitchen table sits

Why Remove the Desk and Cabinet
Sherry’s junk drawer project prepared us for removing that desk area and the cabinet above it — our future doorway will cut right through that section. We had taped off the intended opening with painter’s tape months ago to live with the placement and confirm the sightlines. After two months it felt right: the opening will brighten the kitchen and mirror the width of the dining room window, creating a balanced sightline.

That desk never served us well — it mainly attracted clutter, much like our kitchen table, which we’re trying to keep clear. We weren’t short on storage either, so relocating the items wasn’t an issue: empty lower drawers and a mostly empty lazy Susan provided plenty of space for things formerly housed in the glass-front cabinet.



Removing the Upper Cabinet
The upper cabinet came down easily. We removed the glass doors first to avoid breakage, then unscrewed the cabinet from the wall and the adjacent unit. We’d like to reuse the glass-front doors somewhere else in the house if they fit — otherwise they may get repurposed in another room.



Removing the Desk and Granite Backsplash
The desk countertop and backsplash were more stubborn. We cut the silicone caulk holding the backsplash and pried it off. Then we cut the caulk between the countertop and the wall, but the granite was heavy and well bonded. After repeated cutting and a strong tug, the granite and drawer tipped out — a reminder that granite is very heavy. (Safety note: wear shoes when demo-ing; we learned the hard way.)




There was minor damage where the desk sat: missing trim, leftover glue, and a small floor hole where a leg had been. These are fixable with scraping, wood putty, sanding, staining, and trim replacement. Since the cabinets will get painted in Phase 1, we may skip some of the staining work and focus on the trim and seams.

Floor Repair and a Surprise Discovery
When we removed the desk leg, we found the vinyl didn’t extend under it, leaving a small hole. Fortunately, the previous owner left spare vinyl tiles. As we lifted the damaged tile, we uncovered original hardwood flooring beneath a thick plywood layer — an exciting discovery that hints at potential future restoration. Restoring hardwood would be a Phase 2 project since it would require removing lower cabinets and appliances.



For the short-term fix, I trimmed a spare tile to size and slid it into place, relying on existing glue residue rather than peel-and-stick backing. We weighted the tile with Clara’s car seat while the adhesive set, and the repair is secure and nearly invisible. A small gap remained in the molding, so we reused a piece of quarter-round and filled gaps with spackle to tidy things up.




Next Steps: Paint and Prep While We Wait
With the desk and upper cabinet removed and the wall tidied, the next logical step is priming and painting the dark paneling — especially since the structural opening will require a permit and a pro, which could take some time. Brightening the walls and cabinets now will make an immediate improvement while we plan the larger structural changes for Phase 2.
We’ll continue updating progress as the painting and prep work move forward. For now, Phase 1 is off to a solid start: one junk drawer tamed, one cabinet down, one island planned, and one brighter kitchen on the horizon.