Widening Our Doorways Day 2: Progress and Next Steps

Day two with the renovation crew was a mixed bag: progress in several areas, setbacks in others. Overall, we moved the project forward, solved a few problems on the fly, and learned which tasks will need a different specialist. Here’s a clear recap of what went well and what went wrong so we can keep the kitchen and adjoining rooms on track.

    1. The electrician installed a proper switch for the kitchen light, finally giving us full control over the lighting. This small upgrade improves both functionality and safety while work continues in that zone.
    2. The Parker team completed the drywall installation to close off the former dining room door. The patch work looks solid and gives us a clean wall surface ready for priming and paint.

Newly installed drywall and kitchen lighting

    1. They successfully widened the doorway from the den into the sunroom, creating a brighter, more open back entrance. The updated opening will pair nicely with the new laundry nook we’re planning to install to the right of the door, creating a practical transition space between indoor and outdoor areas.

Widened doorway to the sunroom

Now for the more difficult parts of the day:

  1. The electrician arrived much earlier than expected—around 7:45 a.m.—which led to an awkward moment when I was bringing the dog in from the yard. It was an embarrassing start to the morning but harmless in the end.
  2. The Parker crew was unable to widen the brick-framed opening between the kitchen and den. The masonry challenges proved more complex than anticipated, and they didn’t have the specialized skills or tools required. They refunded the portion of the fee for that work, and we’re now actively searching for an experienced mason who can handle structural brick work without risking damage to the roof or surrounding structure.
  3. During haul-away, some paint cans being transported in the Parker team’s trailer were crushed by remaining cabinet demolition debris and ruptured. That left paint splattered across our relatively new driveway. Fortunately, with steady hands, a hose, and time, we were able to clean most of it up. It was messy and frustrating, but manageable.

The crew is back today doing touch-ups and wrapping smaller tasks while we continue looking for a qualified mason. Our current timeline depends on finishing that last doorway: if the masonry work is completed by Tuesday, the flooring contractor can stay on schedule and begin on Wednesday. Keeping the flooring timetable intact is important because it impacts the cabinetry and finishing work that follow.

What we’re focusing on now to keep the renovation efficient and on budget:

  • Hiring a licensed mason experienced with brick openings and structural reinforcement so the doorway between the kitchen and den is widened safely and correctly.
  • Scheduling the floor installer contingent on getting the doorway completed to avoid downtime and extra costs.
  • Coordinating with the electrician and other trades to sequence work logically: lighting and electrical finishes after walls and ceiling touch-ups, but before final flooring and trim installation.
  • Keeping a close eye on debris removal practices to prevent future damage to the driveway or landscaping during demolition and haul-away.

We’re optimistic that with the right mason on board, the remaining structural work will proceed without further delays. For now, the project has both noticeable improvements and a few lessons learned about hiring the right specialty trades. Fingers crossed that the next few days go smoothly so we can maintain momentum and keep our renovation schedule intact.