In Hawaiian, “aloha” means both “hello” and “goodbye,” so we returned from Hawaii to Richmond with mixed feelings — happy to be home, but also confronted with half-finished cork floors. We’re excited to share how the cork floor project began (we actually started it about twenty-four hours before we left) and what we learned during the first few days of installation.
We’re still shaking off jet lag — flying home on a red-eye with a toddler was an adventure — but we’re grateful for the break to unplug and enjoy some sun and sand. For now, here’s an update on the cork flooring we began installing before our trip. We’ll finish the job and publish a full reveal once the floor is done, and we’ll also share more about our Hawaiian trip after we sort through the photos.

We had planned to complete the flooring before leaving. The house photo crew finished on a Friday after three intensive weeks of shooting, and we scheduled our trip for the following Tuesday morning, which left a weekend and one extra day to install the cork while Clara napped or slept. Unfortunately, we discovered on Friday night that we hadn’t let the cork boards acclimate outside their boxes for the recommended 48 hours. They’d sat boxed in the bedroom for months after we picked them up on clearance in October — and we never removed them to acclimate. That meant nothing got installed during the whole weekend while we waited for the boards to adjust to our home’s temperature and humidity.

Waiting wasn’t all bad — it gave us the chance to read up on floating cork floor installation. We went through how-to articles and learned key steps like removing shoe molding, leaving an expansion gap around the perimeter, and trimming door casings so the cork can slide beneath for a seamless look. When a floating floor is installed, it must have space to expand and contract with temperature and humidity changes; our cork manufacturer recommended leaving a 5/16″ gap around the edges, which the base shoe molding hides once reinstalled.

For the door moldings, instead of cutting the flooring to fit every groove, we removed a thin sliver of the molding so the cork could slide underneath. I used a simple method of laying a handsaw flat and sawing along the molding’s edge as a guide — it felt odd at first, but it worked cleanly and efficiently.


Once all the shoe molding was removed, the door casings trimmed, and the transition strips pried up, the room was prepped. We swept thoroughly to remove debris that might puncture the underlayment or cork.

After the 48-hour acclimation and final cleaning, we laid the recommended underlayment. We chose a recycled-material underlayment that was thin — the goal was to keep the finished floor height as low as possible because we’re floating the cork over existing flooring rather than removing the old vinyl (there’s an asbestos liner under the vinyl, so removal wasn’t an option). The cork itself is thin as well, so once installed the finished floor should be roughly a quarter-inch higher than the surrounding hardwoods, and with careful transitions shouldn’t cause any tripping hazards.

Because we were pressed for time the Monday before our trip, our photo documentation for the early steps is limited, but we did get most of the underlayment down on one side of the room. The underlayment came in strips that lay next to each other and adhered along a sticky edge; we trimmed the material with scissors to fit around the stone fireplace surround.

To install the cork planks we bought a small flooring kit with spacers, a pull bar, and a tapping block. The spacers hold the 5/16″ expansion gap at the wall, the tapping block protects the boards when you tap them into place, and the pull bar helps install the boards closest to the wall. I’ll show these tools in action in later posts.

The first rows were slow because many pieces needed cutting. Once we got past the initial cuts, snapping together full boards went quickly. We staggered the end joints for both structural stability and a natural appearance — with 36″ boards we offset by about 12″ between rows to create a classic, hardwood-like pattern.

Cutting the boards was easier using our table saw set up outside in the carport. It made straight cuts fast and saved a lot of time compared to making each cut by hand inside the house. After working through the fireplace area and starting each row with the staggered pieces, we managed to cover roughly 30% of the floor in about five hours. We had hoped to complete the area behind the peninsula before leaving, but a surprise snowstorm, last-minute photo meetings, and packing for Portland and Hawaii kept us from finishing.

Having the floor started makes the rest easier, so our goal is to finish and photograph the completed floor this week. We’re cautiously optimistic we’ll wrap it up by midweek and post full installation photos and tips soon. We’ll also document transitions and the final trim work — those details matter for both appearance and safety.
How about you — any flooring projects underway? Do you prefer to leave a house spotless before a trip, or do you sometimes start a project and leave it waiting for your return?