When we last updated the kitchen floor project, it looked nearly finished — but a few finishing touches were still needed. The gaps around the edges required shoe molding to allow for normal expansion and contraction, and the seams needed additional sealant coats to protect against moisture and increase durability.

img 45393 1

Adding shoe molding closes the visible gap along the walls:

img 45393 2

And instantly makes the perimeter look completed:

img 45393 3

Of course, after nailing the shoe molding in place there’s caulk to smooth seams and paint to cover nail holes and touch up corners — all the things that make trim look polished.

We originally planned to reuse the old shoe molding we had saved and labeled when we removed it, thinking it would save time. But once we test-fit some pieces, the older painted trim looked a little rough. The edges weren’t crisp and even with touch-ups we worried the contrast between bright white trim and the dark floor would make imperfections obvious.

img 45393 4

So we decided to install new shoe molding throughout. We already needed a few new pieces around the peninsula, which hadn’t had trim before, so buying the rest of the trim wasn’t a big expense — about $35 total — and gave us a cohesive, “like-new” appearance.

img 45393 5

Without a pneumatic nailer, we installed the molding the old-fashioned way. After cutting each piece, we pre-hammered the nails into a scrap block to get them started so we could avoid heavy hammering directly on the floor. We also put cardboard under the work area to protect the new surface from dings while we worked.

img 45393 6

Once a nail was set as far as possible by hand, I used a manual nail punch to sink it just below the trim’s surface. That tool is indispensable for finishing trim without leaving hammer marks.

img 45393 8

The peninsula area was the most notable change because it previously had neither baseboard nor shoe molding. Adding the baseboard and then the shoe molding immediately made that section look complete.

img 45393 9

img 45393 10

img 45393 11

After installing the shoe, we ran a bead of caulk along the seams and into corners to create a smooth transition between the trim and wall. We smooth the caulk with a finger dipped in warm water to keep it neat and prevent it from sticking to skin.

img 45393 13

img 45393 14

The next major step was sealing the cork. Although our planks came pre-sealed on the surface, installers recommend applying three additional coats of water-based polyurethane to seal the seams between boards and add long-term protection. To clarify best practices we contacted Lumber Liquidators and spoke with an installer who works with the Lisbon Cork we purchased. His guidance was:

  1. Hand-sand with 100–150 grit sandpaper to remove some of the existing finish.
  2. Apply poly with a 3/8″ nap roller.
  3. After each coat dries (about four hours per the product label), repeat sanding and poly application two more times for a total of three coats.

img 45393 15

We followed the installer’s recommendations only for testing and then adjusted after seeing the results. Using 100–150 grit on a sample plank produced visible swirl marks, and applying poly with the recommended 3/8″ nap roller left a noticeable purple-blue haze on the finish. Both results were unacceptable to our eye, so we tested further.

img 45393 16

We discovered that skipping the sanding on our cork sample avoided scratches and actually made the color richer once the poly was applied. For application, switching to a very smooth foam roller produced thin, even coats without the purple haze. Thin layers adhere and wear better than thick ones, so this method felt right and looked far superior.

img 45393 17

We used a water-based polyurethane recommended by our local store to avoid the strong odor of oil-based products. We applied three thin coats on consecutive nights and allowed proper drying time between coats. So far the finish has held up well to everyday life — small spills wipe up easily, hot water was contained during one incident, and there are no visible marks from dropped plates or our toddler’s toys.

img 45393 20

img 45393 21

The final finishing touch was installing transition reducers at the four doorways. Because the kitchen floor sits about a half-inch higher than adjacent rooms (we floated the cork over an asbestos-lined vinyl underlayer), reducers prevent exposed cork edges from getting nicked. We were advised to use oak transitions since cork edges can be vulnerable. Lumber Liquidators had options around $45 each, but we found similar oak reducers locally for about $29. After measuring, cutting, and nailing them in place, the floors are now mostly transitioned; a couple of longer reducers are on special order.

img 45393 22

Once the adjoining floors are stained a deeper tone to better match the kitchen, the overall flow will improve. The cork and hardwood won’t be identical, but a shared rich mocha tone will help unify the spaces.

img 45393 23

With the shoe molding installed, seams caulked, cork sealed, and most transitions in place, the kitchen floor is essentially complete. We’re planning a full after gallery along with a budget and timeline breakdown for the whole project — coming soon. In the meantime, what projects did you tackle this weekend? Any trim or sealing work on your floors?