Good news: we made progress on the deck build. Huzzah. Bad news: not as much as we hoped. It felt a little like past weekend projects that stretch longer than planned — the kind where you think you’ll finish everything and end up merely getting started. That’s the reality of most DIY projects, but we did make meaningful headway.

Midweek we had all of our materials delivered from the local lumberyard — about $1,000 including delivery, fasteners, metal hardware and concrete for footers. The delivery went smoothly, though we nervously watched a forklift squeeze under our low carport roof with only an old plant hook grazing the top. Close call.

img 47877 1

My dad arrived Thursday morning to help while Sherry tended to Clara, photographed the progress, and checked details as we worked. We spent the first hour talking through the plan. This was my chance to verify the sequence and my dad’s chance to get familiar with the approach. Our deck frame will be attached mostly to the house, so it only requires two posts out from the building for support; most of the deck sits on a ledger bolted to the house. The county requires a footing inspection mid-project to confirm post hole depths and widths, but we decided to begin other framing steps first so we could be precise about footing locations and possibly get early feedback from the inspector.

img 47877 2

Thursday’s focus was installing ledger boards and joists. The ledger attaches to the house and the joists connect to each ledger using metal hangers to create the deck’s structural span. Proper ledger installation is critical: the ledger must connect into the house’s band board (not merely the siding), and flashing must be installed to prevent water intrusion and rot. After researching the best approach for brick and siding, we followed guidance to trench out the mortar joint just above the ledger so the flashing could be tucked in.

img 47877 3

img 47877 4

Trenching the mortar joint with a circular saw and masonry blade created a lot of dust — Clara thought it looked like hibachi smoke and warned, “fire is hot!” Eventually she enjoyed the activity once Sherry compared the white dust to snow. We used vinyl flashing rather than aluminum because our county code prohibits aluminum with pressure-treated wood; copper was an option, but significantly more expensive. I hemmed the flashing and tucked it into the trimmed mortar joint, sealing seams later with clear silicone caulk for extra protection.

img 47877 5

img 47877 6

With the flashing in place, we cut and prepared the first 2 x 8 ledger board for the brick side. Local code requires specific fastener types and spacing; our county’s guide mandated hot-dipped galvanized lag screws spaced no more than 23″ apart, and joists limited to 16″ on-center. We elected to place lag screws every 16″ to keep layout simple. Driving those large 1/2″ x 6″ lag screws through brick and band board was labor-intensive — my drill didn’t have the torque, so we hand-wrenched them with a socket wrench and improvised a lever extension using a scrap of pipe. After checking in the crawl space we realized the 6″ screws didn’t fully penetrate the band board, so we upgraded to 8″ lag screws. A few of the longer screws broke while driving, which required removing broken pieces and re-drilling holes — an annoying but fixable delay.

img 47877 9

img 47877 11

By early afternoon we’d made steady if slow progress. After a break we completed the rest of the ledger on the brick side and then turned to the siding side. To align both ledgers level to one another we temporarily installed a joist and used it as a reference. Because you should never fasten a ledger through siding, we removed a strip of wood siding at the marked height so the ledger could attach directly to the band board. Cutting into the siding felt nerve-wracking, but accurate measuring and careful sawing kept the cut clean.

img 47877 18

img 47877 19

With the siding pulled back, we slipped flashing under the bottom edge and nailed it in place, planning to seal nail penetrations with silicone. By early evening and with a thunderstorm approaching, we wrapped up for the day. We hadn’t yet measured for post holes or finished both ledgers, but we had completed critical waterproofing and most of the ledger work — the framing foundation that ensures a long-lasting deck.

img 47877 24

Turns out the early stages of a deck — leveling, ledger installation, flashing and precise measurements — take the most time, but they’re essential. We’re pacing ourselves, working evenings and weekends, and accepting that progress will be steady rather than fast. Next steps are finishing the ledger installation, digging the footing holes, and scheduling the footing inspection. We’ll keep you posted as we move forward.

img 47877 25

Anyone else tackling a project that’s taking longer than expected? Snags are part of the process, and getting things done correctly matters more than rushing. I’ll be spending the next few days brushing sawdust out of my eyebrows.

Pssst- See how we started planning the deck in earlier posts: Attacking the Alley, Clearing the Alley, Balcony Be Gone, Material Girl Guy, and Permission Accomplished.

img 47877 26

Slow and steady isn’t glamorous, but it builds a solid deck. Here’s hoping steady progress keeps us moving forward.