How We Dug Post Holes for Our Deck

featured 48043

Before we jump into our weekly deck update, we have to say: HOLY COW—your homes are amazing. So many of you sent house-crash suggestions for our trip to Atlanta and the Haven conference that we wish we could visit every single one of you. We’ve mapped out a plan to stop by as many as we can, and we’re a little bummed we can’t get to everyone this time. We might be back in the fall for a book tour, though, so there’s always next time. Huge thanks to everyone who offered to let a toddler, a chihuahua, and two nosy bloggers poke around.

Now, on to the deck. I’m proud of this post title because it manages to include two deck puns: leveling and digging. After Deck Day #1, Day #2 didn’t deliver quite as much progress as we hoped—so we waited until we had more to show. Between Day #2 and Day #3 we finally completed the ledger board on the siding side of the house and finished digging all the post holes. Below is a clear summary of what we accomplished over those two days of deck work.

At the end of Deck Day #1 we had already hung a ledger board on the brick side of the alley and prepared the siding side for its ledger. The next task was to mount that second ledger board against the house. If you want a deeper explanation of what a ledger board does and how it’s attached, refer back to our earlier post linked above.

img 48043 1

We started by laying out where the joist hangers would go so we wouldn’t accidentally place bolts where the hangers had to sit. Because the hangers on this side had to line up with those on the brick side, I made a simple diagram with measurements to transfer the spacing accurately. Clara contributed an artistic crayon flourish to the plan.

img 48043 2

This ledger was a bit unwieldy—a single 17-foot 2×8—but with my dad’s help and some scrap wood for leveling, we got it into place and fastened it. Bolting went faster than the brick side because we used 6″ lag screws into wood instead of drilling into masonry.

img 48043 3

Since the ledger went up quicker than expected, we added joist-hanger installation to the day’s plan. Our aim was to have the post holes dug by day’s end, and it was only late morning, so we figured we could get the hangers in quickly. We used a level and a scrap joist as a guide and installed every third hanger first—this let us use the full length of the level—then filled in the gaps.

img 48043 4

The process was straightforward, if a bit time-consuming. We had a small audience watching from the doorway—Clara and Burger kept us company while we worked (and provided comic relief).

img 48043 5

By early afternoon we’d finished the hangers on one side, but hunger and schedule constraints nudged us toward lunch. After eating, we focused on marking the locations for our post holes. The framing plan (shown in the 3D rendering provided with our plans) calls for two posts at the outer end of the deck, two for the middle of the stairs, and two at the bottom of the steps.

img 48043 8

Translating those points to the yard required a bit of geometry and planning: we determined the deck edge, decided on a 45-degree angle for the stairs, and staked lines using string tied to bolts driven into the ground.

img 48043 10

To figure stair length and riser/run, we used an online stair calculator and hashed out stair design around temporary stakes. We debated options—a flared bottom, a mid-platform, or classic straight stairs—but space limitations and the nearby air conditioner led us to choose simple straight stairs. We later shifted the stair layout five inches away from the house to create a buffer next to the AC unit, and we plan to plant a buffer on that side so the compressor airflow isn’t blocked.

img 48043 12

By late afternoon we called it for Day #2 and delayed digging until we could get heavier equipment. Enter Deck Day #3: my dad showed up with a two-man auger rented from Home Depot’s tool rental center. After struggling with manual post-hole digging for previous projects, we decided the auger rental was worth the money.

img 48043 15

The auger cut into the soil like a giant drill. I made a shallow starter mark for each hole so the bit would sit in place before firing up the engine. The auger is heavy and best handled by two people—one to control speed and the other to steady the unit—so we worked in pairs, letting the weight and rotation do most of the digging. We paused frequently to remove loose soil and to tidy the hole with a shovel and post-hole digger.

img 48043 17

Important safety note: always call your local utility-marking service before you dig to ensure there are no buried pipes or cables where you plan to work—we completed that step early in our planning process.

img 48043 18

The auger we rented had an 8-inch bit, but inspection requires 12-inch-diameter holes, so we had to widen each hole by hand to meet the 12″ requirement. We also dug to at least 18 inches deep—the local frost line requirement—and aimed for around 21 inches so we could add a few inches of gravel for drainage before pouring concrete.

img 48043 24

Clearing and sizing the six footer holes took us roughly two hours. It felt fast compared to the other stages of deck construction, but the humidity made the work exhausting. Once the holes were cleaned out and measured, we felt ready to schedule our footing inspection. I’m pretty confident about the work, but inspections always make me a little nervous—fingers crossed for us.

img 48043 27

So that’s where we are: ledger boards up, joist hangers installed on one side, and all six post holes dug to spec. Next steps include confirming the inspection, pouring concrete footings, and beginning the support beam and joist installation. Have you tackled auger work or post-hole digging for a deck or fence? Renting an auger saved us significant time, and at $60 for a four-hour rental it was money well spent for this phase. We’ll keep sharing weekly updates as the project progresses toward completion.

Psst—If you want to follow the deck from the beginning, we’ve documented planning, clearing the area, getting a permit, demoing the old deck, and day one of building in earlier posts linked above.