Objectales

Popular

Blog Post Anatomy: Structure, Elements and Examples

featured 40372

Ever wondered what goes into creating one of our posts? Maybe you haven’t, but here’s a behind-the-scenes look at our process anyway. We take post production seriously—partly because our mortgage depends on it—so this isn’t a prescription for how everyone should write, just a snapshot of how we do it. Most of our project posts follow a similar workflow: planning and prepping, doing and documenting, then posting and responding to comments.

We often juggle multiple projects at once, and they can be at very different stages. Some posts come together in a day or two, while others stretch across weeks. Below is a step-by-step example using our bathroom mirror project, which turned into a bit of an adventure.

img 40372 1

In general, we might be planning one project, executing another, and responding to comments on a third—all in the same week. The timeline for the mirror illustrates how a single post can shift and adapt as problems arise and new plans get made.

img 40372 2

SUNDAY, AUGUST 21

8:30 AM: Sherry decides we should have a quick, one-day project to share the following morning. I suggest finishing the bathroom mirror—something on our to-do list since January that seems straightforward. I look up a few tutorials for tips (including Layla & Kevin’s experience) to get us headed in the right direction.

10:00 AM: After breakfast we head to Lowe’s for mirror adhesive and trim. Shopping together helps us agree on materials—trim comes in many sizes and styles, and making those choices as a team saves time and second-guessing.

img 40372 4

11:30 AM: Back home, Clara naps while I take “before” photos and remove the door. Sherry continues writing another post.

img 40372 5

1:00 PM: I apply the adhesive and we position the mirror, taking extra photos for the eventual post. Then we read the adhesive instructions: wait at least 72 hours before sealing edges. That ruins our plan to publish Monday morning. Plan B becomes necessary.

img 40372 6

1:15 PM: Plan B: a pallet compost bin we already had materials for. Sherry is relieved the bin is doable in a short time, so I build, photograph, and write that post while the mirror cures in the sunroom.

MONDAY, AUGUST 22

10:00 AM: The pallet compost bin post goes live. The mirror is still setting.

img 40372 7

WEDNESDAY, AUGUST 24

9:00 AM: With my mom watching Clara for a few hours, I return to the mirror project—still shy of the recommended wait time—while Sherry tackles a rocking-chair refinishing project. We aim to have the mirror ready by the following Monday, since guests are coming that weekend.

10:30 AM: While taking photos I realize the 3/4″ trim we bought looks flimsy. Sherry agrees; it reads cheap. Time for a trim upgrade.

img 40372 8

10:45 AM: I run back to Lowe’s for thicker trim.

11:30 AM: Back home, I measure, cut, and photograph the new trim application. Taking extra photos always slows us down, but it gives more options for the post.

img 40372 9

12:45 PM: I glue the trim in place before Clara wakes, so I can switch to babysitting duty while Sherry moderates a flood of comments. The trim glue sets overnight.

img 40372 10

THURSDAY, AUGUST 25

11:30 AM: With Clara napping, I tidy the sunroom and rehang the bathroom door, thinking the glue has cured enough. I enjoy the small victory of regaining bathroom privacy and take a quick shower during nap time.

11:55 AM: Shortly after, we hear a crash: the mirror has fallen. Frustration sets in, and I scrape off semi-hardened glue from the mirror, door, and trim—an oddly cathartic process.

img 40372 11

1:00 PM: We re-glue the mirror, this time using extra care, and accept that it will need a full week to set. Our sunroom will stay half-full of a door and we’ll have a doorless bathroom for a while, but that’s manageable.

SATURDAY, AUGUST 27

Hurricane Irene cancels our guests’ travel plans, which is a disappointment but also convenient since our chaos won’t be on display—and we were without power anyway.

WEDNESDAY, AUGUST 31

8:00 PM: With the one-week timer nearly up and Clara asleep, I cautiously test the mirror after adding security nails and let it stand overnight with a pillow at the base as a precautionary “overnight test.”

THURSDAY, SEPTEMBER 1

8:00 AM: The mirror survives standing up, so I photograph the nail system in daylight.

img 40372 12

11:00 AM: While Clara naps and Sherry moderates comments, I lay the door back down and re-glue the trim.

SUNDAY, SEPTEMBER 4

8:30–10:30 PM: We’re out of town for Labor Day, which forces a few extra days of curing but gives me time to sort and size photos and draft the post. I leave placeholders for final after photos.

TUESDAY, SEPTEMBER 6

11:00 AM: We return home and I rehang the door. Sherry jokes about taking after photos before it falls, but it’s raining and I want to be sure the mirror survives overnight.

WEDNESDAY, SEPTEMBER 7

8:00 AM: The mirror is steady. I set up a tripod in the dim light and shoot after photos while Sherry entertains Clara, who insists on inspecting her reflection.

img 40372 13

9:00 AM: After photos are uploaded, I quickly size and add them to the post. Sherry proofreads while I handle last-minute edits.

10:00 AM: The post goes live—about two and a half weeks later than planned. Sherry moderates comments while I get Clara settled for another nap and start prepping the next post.

11:00 AM: With Sherry still answering comments, I size photos and write a post about our office desktop project, which is ready to be photographed and posted the next morning. Publishing eight posts across five days means several are in progress at once—some in planning, some in execution, and some in the final editing and comment-moderation stages. It’s juggling, but it keeps things interesting.

That mirror post was longer and bumpier than many. Some projects move from start to publish in a day (we’ve had ones that did), and others—like our wall-to-wall desk, patio, or laundry room—are tackled in stages and shared as they progress. What surprised you about what goes into a single blog post? What in your job or daily life is more involved than people realize?

THE END