Beach House Renovation: Major Tiling Progress, Running Water, and Trim Updates
We made huge progress at the beach house last week — logging more than 40 hours of tiling across four days and finishing (almost) every tile surface in the house. We also put together a short video to walk through the updates, highlight a few non-tiling milestones, and show the work in each bathroom.
Previously we tiled floors and shower pans by making a couple of short 48-hour trips, but finishing eight shower walls was a far bigger undertaking. This time we brought the kids and the dog since school hasn’t started yet, and a friend kindly offered us a place to stay in town while she was away. That gave us the flexibility to stay longer without worrying about hotels or child care. The result: serious tiling got done.

John handled most of the tiling while I kept the kids and dog entertained around Cape Charles. It felt good to keep the family together and nearby between bursts of work, and it was handy to be available to bring ice cream or check in if he needed a break. By the time we left Sunday morning two of the three bathrooms were fully tiled and the third was about 90% complete — meaning they’re practically ready for grout and soon to receive toilets and sinks.
Best of all: we officially have running water. The house is hooked up to the street supply, and in the video I even turn on the hose bib. After the long drama of getting water to the property, it’s a huge relief to know that toilets will actually flush when we install them.

The tile palette we used includes a basketweave for floors, a slate-like porcelain, and longer 4 x 16″ subway tiles for walls. The downstairs bathroom, with its 9-foot ceilings, used the oversized 4 x 16″ subway tiles on all three walls, which sped up the install compared with smaller 3 x 6″ tiles. The upstairs en-suite used the same wall tile on two walls (the third will be a glass panel) and pairs nicely with a small-scale hex floor tile.

The most time-consuming detail in the en-suite was tiling the curb, which wrapped around two sides and required careful mitering for clean corners. Instead of capping the curb with a marble or stone slab, we carried the wall tile over the top and used halved bullnose tiles as a subtle pencil border for a seamless look.

The hall bathroom is nearly finished as well — only a small section of one wall and the front curb still need tile. John ran out of thinset and energy, so we’ll be back in a few days to finish the last bits together. When tiling a wall, remember not to rely on the floor being perfectly level: set your first row off the ground on a temporary piece of scrap wood that you remove after the wall above it is set. That ensures straight, level rows all the way up.

Waterproofing tip: for screw holes through a waterproof membrane we used the Schluter/Kerdi system and sealed the holes with Kerdi-Fix (a silicone-like sealant), let it cure, then continued with thinset and tile. That keeps the assembly watertight.
One of the feature walls is covered with a patterned blue tile that comes in 13 x 13″ squares composed of smaller motifs. Because the tiles aren’t identical, we deliberately mixed and offset them to avoid repeating patterns clumping in one area. Offsetting the seams between tiles helps preserve the intended visual flow and prevents obvious seam lines between the large squares.

Grout will change the final look considerably: we’re using low-contrast grout on most walls so the strong grout lines you see now won’t be as prominent when it’s finished. Grout color greatly affects the perceived pattern and shape of tile, so we chose colors that will soften the contrast and let the tiles feel layered and cohesive.

Other notable progress: the pocket doors in the back bedroom are hung (they’re intentionally left with their chippy finish for now) so we can complete the trim work around them. We hung the doors early to allow trim installation to proceed — it’s easier to remove two pins from hung doors later for painting or sealing than to delay all trim work. The A/C system is installed as well, though it can’t be turned on quite yet; we explain why in the video.

We’re not under any illusion that grouting will be fast or effortless, but we’re excited to see these spaces come together. Expect a few more trips to spread grout, remove haze, and complete final installs — and then we’ll finally be done with the tiling phase.
Psst — if you want to catch up on earlier beach house updates, here are previous posts:
- Original trim, doors, and lots of new tile
- Drywall is up, and it’s glorious!
- Finding a vintage pink stove
- Stuff Sherry bought (way too early)
- The outside’s almost done & the inside’s getting good
- That time our beach house photobombed HGTV
- Walls up, walls down, and a new floor plan
- How we picked the exterior color
- Gathering beach house style inspiration
- Beach house “before” video & floor planning
- Holy seashells, we bought a beach house!
*This post contains affiliate links