DIY Hardwood Flooring Installation: Step-by-Step Guide
By now you’ve probably seen our finished, furnished bonus room above the garage. Before we get to the before-and-after shots, here’s a clear, step-by-step account of how we installed oak hardwood flooring in that space. This was our first time doing a traditional nail‑down installation (we’d previously installed a floating hardwood floor), so we learned a few useful tips along the way. It wasn’t complicated, but there are a few details and challenges worth knowing before you start.

Choosing Our Floors
We originally considered wall-to-wall carpet for the bonus room because it’s cozy and we hadn’t purchased extra hardwood when we finished most of the second floor years earlier. Still, we kept picturing the wood continuing down the hall and into the bonus room, and ultimately decided to go with hardwood so the upstairs would feel cohesive.
Matching the existing floor was the first big hurdle. The upstairs floor is Lono Oak from Lumber Liquidators, and we later discovered it had been discontinued. Fortunately, small amounts of the original product were still available in a few warehouses around the country, so we tracked down boxes from several locations. Shipping from Nevada, Tennessee, Pennsylvania, and Texas wasn’t the fastest or cheapest approach, but the boards were on closeout at a fraction of the original price, which made it worth the effort.

Because the leftover material came from multiple shipments, we mixed boards from different boxes as we installed so any subtle color variation would be distributed across the room instead of clustered in one area.

Preparation
When the boxes arrived we moved them into the bonus room and let the wood acclimate for five days (three is often recommended as a minimum). Acclimation helps the planks adjust to your home’s humidity so they expand or contract before being fastened down.
Next we rolled out underlayment to act as a vapor barrier and to help reduce squeaks between the hardwood and the plywood subfloor. Many people use roofing felt, but we used a white silicone-backed version to avoid extra mess. We overlapped each strip slightly and trimmed the ends with a utility knife as we worked toward the walls.

Laying the First Rows
The first rows require the most planning. Nail‑down hardwood needs a consistent expansion gap around the perimeter so the floor can move. For our 3/4″ planks, we left a 3/4″ gap and used a ruler to mark where the outside edge of the first row should sit. We snapped a chalk line between marks at each end of the wall so the first row would run straight and parallel. A straight chalk line is often more reliable than relying on spacers when walls aren’t perfectly plumb.

To hold boards temporarily we used a few finish nails along the top inside edge (these will be hidden later by quarter round). Since the power nailer won’t fit that close to the wall, the first three rows were installed by hand: we drilled pilot holes every 10–12 inches, drove finish nails, and used a nail punch to set them flush. It’s slow and tedious, but it sets a precise foundation for the rest of the floor.


Using the Floor Nailer
To speed things up we rented an air-powered floor nailer from Home Depot (rental tools are a good option if you don’t plan to use the tool often). The nailer shoots cleats into the tongue of each board, locking planks together and securing them to the subfloor. The cleats come in long strips that load into the tool.

With the tool you set the head over the edge of the board, squeeze the trigger, then strike the back plunger lightly with a mallet to drive the cleat. It doesn’t need to be a bone-rattling blow, but it needs a firm hit to seat the fastener.


We went through over a thousand cleats across the job. Even with two people switching off, the repetitive motion of leaning and striking the nailer gets tiring, so ear protection and short breaks are worthwhile. We found that one person laying boards for a steady supply while the other nailed made the process most efficient.


Cutting Boards
Most rows require a final cut. We kept a pile of boards with knots or blemishes to use as end pieces, trimming off the imperfect section and using the usable remainder elsewhere. To cut for the end of a row, we rotated the board 180 degrees, pressed it against the far wall, then marked a cut line approximately 1/2″ from the end it would sit against. That 1/2″ plus the 1/4″ tongue equals the 3/4″ expansion gap we maintained.

We ran cuts down to the miter saw in batches to minimize trips up and down the stairs. It’s repetitive work, but necessary for a neat finish.

The Last Rows and Finishing Touches
Like the first rows, the last few rows had to be installed by hand because the nailer couldn’t reach close to the wall. That meant drilling pilot holes, driving nails, and punching them flush again — the least enjoyable part after becoming used to the speed of the nailer.

After all the boards were installed we cleaned the floor, then installed baseboard, quarter round, and window trim. We also added built-ins around the window and finished the room with furniture and accessories until it became the bonus room we now use every day — including the oversized sofa that inspired a memorable Father’s Day nap.


If you’re planning a nail‑down hardwood installation, expect some heavy lifting while you acclimate boxes, a fair amount of tedious hand nailing at the starts and finishes, and enjoyable — if repetitive — mallet work with the floor nailer. A good game plan, the right tools, and patience will help you get a clean, lasting result.

More Flooring Projects
If you’d like more inspiration or how-to guidance, here are other flooring projects we’ve documented:

- Refinishing Hardwood Floors 101
- How To Select Hardwood Flooring
- How To Install Hardwood Floors Without Nails
- How To Install Click-And-Lock Cork Flooring
- How To Paint A Floor
- How To Stain A Concrete Floor
- How To Remove Carpet
*This post contains affiliate links








