Installing Our Hardwood Floors: The Delivery and Unloading Story
Late last week we finally began installing our hardwood floors at the new house. The work is going well — we’re doing the installation ourselves — but it’s proving to be a time-intensive project. That’s not ideal when you’re short on time: we’re scheduled to move in this weekend and want to finish four bedrooms and a long hallway before then. Once we have more breathing room and some progress to show, we’ll post a detailed, step-by-step account of the installation process. For now, here’s a still-dusty photo of the first room we officially completed: our master bedroom. (We still need to install the baseboards and quarter-round molding.)

Even before the first plank was laid, the project had already given me a few grey hairs. The very first challenge was simply getting the wood home. Lumber Liquidators called to say our order was ready for pick-up. Clara was napping, so Sherry stayed with her while I ran out to rent a $19 truck from Lowe’s — the rental was cheaper than the store’s delivery option and our order certainly wouldn’t fit in the car. While at Lowe’s I bought the quarter-round molding we needed for the bedrooms and hallway, since they require a purchase before they’ll rent the truck. With the molding in the cab and the rental reserved, I headed down the street to pick up the hardwood.

When I arrived I was surprised by the size of the stack of boxes being moved with a forklift. It was huge — far larger than the small roll of cork flooring I’d managed to squeeze into our Altima before. Seeing that stack made me glad I’d rented the truck.

But my relief was short-lived. As the crew lowered the load into the truck bed I noticed one tire was sitting a little lower than the other three. It wasn’t flat — just a little depressed under the weight. That was enough to make me nervous. The staff adjusted the placement with the forklift to take some weight off that tire, and we agreed it looked stable enough to drive the three miles to our new house if I took it slowly.
The three-mile drive turned into one of the longest three-mile drives I’ve ever had. The load was unbalanced: the boxes were stacked high and not strapped together as tightly as they appeared. Every turn sent the stack leaning, so I crawled around corners in the right lane with my hazards on, going no more than five miles per hour. After a few turns I figured out how to nudge the load back toward the center so the stack behaved better, and I started to relax.

Then it started to rain. In the middle of worrying about tire pressure and a leaning load, I hadn’t noticed storm clouds rolling in. It went from dry to a downpour fast, and dozens of boxes of hardwood were exposed in the truck bed, wrapped only in cardboard. My anxiety spiked.

Fortunately, a previous renter had left a large plastic drop cloth in the truck bed. I pulled off onto a side street and covered the load before it got soaked. Maneuvering to pull off and then get back onto the main road involved a few more nerve-wracking turns, but the immediate crisis was over. One traffic light later the rain stopped, but it remained windy and the plastic began to flap loose. I pulled over again to remove the tarp completely so it wouldn’t come undone on the highway.

By that point I had barely traveled a mile from Lumber Liquidators. My heart was pounding and my shirt was damp from the rain, but the final two miles were uneventful. I arrived at the new house a little grayer around the edges, but with the truck and the hardwood intact.
Then reality hit: I had to unload the truck. I’d completely forgotten to plan for that part. Sherry and Clara were still at our old place — where it hadn’t rained at all — and I was alone. With no forklift available I started carrying boxes one at a time from the truck bed, up the steps, and through a narrow garage doorway before stacking them in the dining room to acclimate before installation. There were 50 boxes.

Each box turned out to be heavier and more awkward than I expected. They weigh about 56 pounds and are roughly five feet long. It took me about an hour to unload them all. Hauling the load out of the truck and into the dining room meant lifting, twisting, and squeezing through a tight opening — not glamorous, but necessary. I didn’t have the energy to carry everything upstairs that night, so the boards stayed in the dining room to acclimate to the house before installation.

The next day Clara was already enjoying the new floors from inside the box stack. Here’s hoping she loves them just as much once the boards are out of the boxes and laid across her room. That’s the project we’re working on today — and after the delivery and the heavy lifting, the actual installation feels like a reward.