How to Demolish and Reframe a Laundry Room
Let’s talk about knocking out a few walls and framing a few new ones: our recent laundry room renovation, from demo to framing, and everything in between.
For two weeks the laundry area seemed stalled while we reconsidered our approach and compared contractor bids. Then, in just a few days, things moved so fast it felt like a spin cycle. What began as a cramped, awkward space…

…quickly transformed into a much more open, usable layout. Yowza.

Early last week we decided to take a hybrid approach: do the work we’re comfortable with ourselves and subcontract specialized tasks. Our goal was Option 4 from a previous planning post: a practical, well-planned laundry room that fits our needs and budget.

We made a clear to-do list and marked the items we planned to hire out. The list helped us prioritize and avoid unnecessary delays. Here’s the plan we followed (items marked with an asterisk were subcontracted or under consideration):
- Move washer & dryer and remove cabinetry
- Demo cased opening, side wall, back wall, part of the floor, and the attic step
- Frame new walls & doorways*
- Move laundry plumbing hook-ups & drains*
- Move laundry electrical (lights, switches, outlets)*
- Move dryer vent
- Hang drywall
- Add insulation
- Mud, tape, and sand all drywall seams in the new room*
- Rehang laundry door
- Add new frosted door to attic
- Prime & paint laundry room and hallway walls
- Tile & grout new laundry floor
- Add baseboard and door casings
- Add upper cabinetry and shelving
- Tile & grout laundry room backsplash
- Reinstall washer & dryer
- Add lower cabinet
- Add ceiling light fixture
- Hang art, ironing board, and other laundry room items
- Finishing touches and small repairs (garage drywall, attic step, etc.)
We had already moved the appliances, so the first big phase was demo. On Tuesday we removed baseboards and trim carefully so we could reuse as much as possible.

Next came drywall demo around the cased opening. To avoid losing cool air to the storage room, we left other walls intact as long as possible. My demo tools were simple: a rubber mallet and a crowbar.

Cleanup has been a mix of sweeping smaller debris into garbage bags and staging larger pieces in the attic for later removal. At some point we’ll bring in a small dumpster or another Bagster to get rid of the bulk. We saved some materials—studs and trim—for potential reuse.
We removed the old cased opening framing next. This involved serious prying and hammering to separate nails and studs, but everything came down methodically.


After removing the framing we took down the upper cabinet so the space was clear and ready for the next steps.

We also removed sections of hardwood floor where the new wall would sit. Because we installed the floor using Elastilon—a strong adhesive sheet—the process differed from prying up nailed planks. A flat-head screwdriver used as a chisel helped lift the plank sections, and then a utility knife cut through the Elastilon layer so we could remove the exact area we needed. We removed the particle board subfloor to expose the plywood ready for framing.


Removing the floor clarified a minor plan change: we decided to move the frosted storage-room door forward to where the hardwood ends. This avoids extending the hardwood into the storage room (we’re considering carpet there), shortens the hallway slightly, and creates a small vestibule so the door swings into that space instead of into the center of the room—an improvement for future furniture layout.

Before framing we also removed a single attic step that was in the way; it will be rebuilt on the other side of the platform later.

We paused demo where recommended and brought in our framer, David from Chicas Construction, to tackle the structural framing. He completed the first pair of new walls in under three hours—speed and experience made a big difference and freed us to schedule plumbers and electricians quickly.


Plumbers arrived later that day to disconnect old hookups and install new plumbing in the garage ceiling access area, which made the job quicker and cleaner inside the house. They cut a large section of garage ceiling that we’ll patch when we drywall the garage.


The electricians followed the next morning and quickly relocated laundry outlets and added wiring for lights, switches, and new fixture boxes. We planned outlet and fixture locations ahead of time to save labor hours and avoid awkward placements— for instance, the laundry room light box is centered with future upper cabinets in mind, not just the room’s bare footprint.


During the weekend we completed the second phase of demo now that plumbing and electrical were relocated. Large drywall sections came down in sheets, revealing daylight in the hallway we hadn’t seen before.


With more framing removed, we finally got a real sense of the new laundry room’s footprint. The electricians left dangling outlet boxes positioned to be easily set into the next framed wall.


We removed the old washer hookup wall where it now opens into the storage room. The plumbers had disconnected piping and left old pipes for me to cut out during demo, which was straightforward with a reciprocating saw.

That brings us to the photo at the start of this post. The next construction step is finishing framing the two remaining walls—the wall that will fully enclose the laundry room and the wall that will house the frosted storage-room door. Once framing is complete we plan to tackle drywall ourselves (we’ll mud and tape, and practice as needed), though a few items remain first, like rerouting the dryer vent.

Here’s the updated floor plan showing the former laundry labeled as such—small satisfactions count.

Move washer & dryer and remove cabinetryDemo cased opening, side wall, back wall, part of the floor and the attic stepFrame new walls & doorways*Move laundry plumbing hook-ups & drains*Move laundry electrical (plus other lights, switches, and outlets)*- Move dryer vent
- Hang drywall
- Add insulation
- Mud, tape, and sand all drywall seams in the new room*
- Rehang laundry door
- Add new frosted door to attic
- Prime & paint laundry room and hallway walls
- Tile & grout new laundry floor
- Add baseboard and door casings
- Bring washer & dryer back in and hook them up
- Add upper cabinetry and shelving
- Tile & grout laundry room backsplash
- Add lower cabinet
- Add ceiling light fixture
- Hang art, ironing board, and other laundry room items
- Finishing touches and repairs (garage drywall, attic step, etc.)
Last photo before I taped up drop cloths to block hot attic air: glorious natural light finally streaming down the hallway.

We’ll share a cost update once we have final invoices from the framer, plumbers, and electricians. So far the subcontractor totals look favorable compared with the contractor estimates we were evaluating.
How was your weekend? Anyone else swing a rubber mallet and show some drywall who’s boss?