Listy VonListerson Update: New Features & Changelog
These posts began because readers asked how we keep track of the long list of projects around the house. Our system is simple: one long running document we update as we go. When we first shared this list back in May, nothing had been crossed off. A few months later we finally had some progress to report — and yes, we love crossing things off. Below is an updated, room-by-room rundown of what we’ve done and what’s still on the to-do list, organized for clarity and easy reference.
– The Front Yard (10% Complete) –

To do:
- Remove fast-spreading ground cover
Remove trees that are dead, decaying, or diseased (confirmed by our inspector)- Aerate, level, and reseed the lawn
- Create planting beds in front, mulch and plant them
Repaint exterior siding and trim where paint is peeling and rot exists- Redo the cracked concrete walkway from the driveway to the front door—add curves and planting beds on both sides
- Add raised stone beds or other hardscaping for architectural interest
- Plant dwarf green maples (we loved planting one at our previous house)
- Install subtle exterior up-lighting for nighttime curb appeal
- Add low curved brick borders along the driveway wired with lights
- Get the driveway paved
– The Portico (25% Complete) –

To do:
Repaint portico and sidelights (peeling everywhere)- Arch the portico ceiling for a taller, more elegant look
- Add planters, a new doormat, and updated porch lighting
Paint the front door
– The Garage (0% Complete) –

To do:
- Repaint garage doors and add hardware to improve curb appeal
- Install a pergola above the double garage doors with climbing vines
- Finish the garage interior with drywall to create a workshop and perimeter storage
- Repurpose kitchen cabinets in the garage if they aren’t usable in the kitchen
- Redo the four steps from garage to kitchen (remove old carpeting and either paint or rebuild)
- Build a mobile scrap-wood storage box on casters
- Consider adding vintage lockers painted in fun colors for organized storage
- Possibly add plumbing for a utility sink in the workshop area
– The Foyer (35% Complete) –

To do:
- Remove old carpet from the wood stairs
Paint blue trim in the foyer- Paint the stair balusters
Remove wallpaper and repaint the wallsRemove doors that interrupt flow into the kitchen and the view to the back- Decide on a stair runner later, once we’ve lived in the house for a bit
- Replace or refresh the foyer light fixture
- Assess and possibly replace damaged tile
- Convert the deeper foyer closet into a craft and toy storage area with organized shelving
– The Half Bathroom (30% Complete) –

To do:
Remove wallpaperRepaint all blue trim and the doorUpgrade door hardware and hingesPaint wallsInstall a larger, higher mirrorPaint the vanity using odor-blocking primerUpgrade lighting- Replace a leaky faucet
- Consider replacing the vanity and sink in a later phase
- Replace the tile floor only if it proves unsalvageable (Phase 2)
- Explore adding a tasteful wallpaper or a tiled accent wall since there’s no tub/shower (Phase 2)
– The Dining Room (5% Complete) –

To do:
Clean and reseal the wood floors- Update built-ins: simplify the tops, consider extending to the ceiling and painting white
- Paint the blue trim
- Remove wallpaper and repaint walls
- Upgrade lighting and window treatments
- Add furniture, a rug, and artwork
– The Living Room (5% Complete) –

To do:
Clean and reseal the wood floors- Prime and paint the bright pink walls
Remove old curtains- Prime and paint the woodwork that wraps the lower walls in white
- Whitewash the brick fireplace wall for a cozier feel
- Install gas logs as a future upgrade
- Add additional can lights for even illumination
- Consider turning the overhead beams into a coffered ceiling
- Build or find a built-in style cabinet to house the TV
– The Office (7% Complete) –

To do:
Remove old curtainsClean and reseal the wood floors- Paint walls, trim, and ceiling
- Add a double desk work area
- Bring in storage—bookcases, file cabinets, or built-ins around the bay window
- Install window treatments
- Create a brainstorming area on the walls (bulletin board, chalkboard)
- Add large potted plants in front-facing windows
– The Kitchen (3% Complete) –

To do:
Remove curtains- Strip wallpaper and repaint
- Convert the large triple window into French doors to the deck
- Open the wall between kitchen and living room and add built-ins on either side
- Prime and paint the lower woodwork
- Complete a full kitchen renovation: replace damaged cabinets, laminate counters, worn flooring, lighting, and appliances
- Consider heated floors under new tile, possibly extending into the foyer and hall bath
- Organize the pantry with pull-out drawers, bins, and containers
- Improve the “command center” area across from the triple windows
- Decide on paint color for the new French doors and sunroom door
- Install an under-sink water filter
- Add a pendant over the sink and a larger fixture over the eat-in area
- Create a coat-and-shoe drop zone, possibly in the garage
– The Sunroom (10% Complete) –

To do:
Rip up old carpet and padding- Remove the broken baseboard heater
- Retile the floor with outdoor-safe stone in a later phase
- Convert the sunroom into an open covered porch with new columns and remove old sliders
- Consider building a brick outdoor fireplace off the sunroom
- Add beadboard to the ceiling and paint a soft blue
– Our Bedroom (10% Complete) –

To do:
Remove carpeting and install hardwoodsRepaint trim and doorsInstall wood blinds on windows- Repaint ceilings and walls
- Add built-ins along the window wall with seating and hidden storage
- Install a ceiling light fixture
- Consider textured wallpaper on the ceiling for interest
- Bring in art and window treatments
– Our Bathroom (5% Complete) –


To do:
Remove glass shower doorAdd privacy to the window (frosting or blinds)- Remove wallpaper and repaint walls, trim, and ceiling
- Replace the bathroom mirror and upgrade lighting
- Remove carpet in the sink area in preparation for tile
- Plan a complete bathroom rebuild in Phase 2 to expand the footprint and add improved fixtures and tile
– Our Closet (0% Complete) –

To do:
- Repaint cream trim
- Paint walls and ceiling
- Install a new light fixture
- Remove carpet and plan tile to match the bathroom wing
- Design and install a built-out closet system with drawers, shelves, and varied hanging heights
– Upstairs Hallway (60% Complete) –

To do:
Remove old carpeting and install hardwoodsRepaint blue trim and doors glossy whiteReplace hinges and door hardware (many are rusted)Upgrade to a smart thermostat- Paint walls and ceiling
- Replace or refresh hallway light fixtures
- Convert the linen closet into built-in open shelves or cabinets
- Add crown molding
- Consider adding thick wood wainscoting to break up the long hall
– Clara’s Room (20% Complete) –

To do:
Remove old carpeting and install hardwoodsRepaint blue trim and doors- Add window treatments, art, and accessories
- Paint walls and ceiling
- Consider a full wall of built-ins or bookshelves around the windows
- Build a bench seat in the closet nook with beadboard and wallpaper accents
- Add crown molding
- Install a ceiling light fixture
– Spare Room / Possible Nursery (10% Complete) –

To do:
Remove old carpeting and install hardwoodsRepaint mauve trim and doors- Install blinds and curtains when the room’s use is decided
- Hold off on major decorating until the room has a clear purpose
- Repaint walls and ceiling
- Add crown molding
- Install a ceiling light fixture
– Guest Bedroom / Craft Room (10% Complete) –

To do:
Remove old carpeting and install hardwoodsRepaint cream trim and doors- Paint walls and ceiling
- Furnish with a multi-use bed and a desk/dresser that accommodates a sewing machine
- Organize the closet for craft and gift-wrap storage with shelves and bins
- Add crown molding
- Install a ceiling light fixture
– The Hall Bathroom (5% Complete) –

To do:
- Paint trim and walls
- Replace faucets, mirrors, and lights for a quick update (Phase 1)
- Plan a full renovation later to address stained or cracked tile and leaky fixtures (Phase 2)
– Laundry Nook (10% Complete) –

To do:
Remove old carpeting and install hardwoods- Install washer-proof flooring under the appliances
- Completely renovate the nook with noise-reducing doors, energy-efficient appliances, new counters, and cabinets
- Add a tile backsplash, lighting, and art to make the space feel like a small jewel box
– Unfinished Storage Room (0% Complete) –

To do (long-term):
- Use as storage for now, then consider finishing later
- Future plans might include adding drywall, flooring, lighting, built-out closets, and furnishing as a movie or bunk room
– General Whole House Ideas (0% Complete) –
To do:
- Gradually replace all lights with energy-saving LEDs
- Replace outdated or mismatched switchplates and outlets throughout the house
- Upgrade frames, drapes, sheets, and curtain rods over time as budget allows
– The Back Deck (20% Complete) –

To do:
Remove the giant oak tree that threatens the foundationPatch the deck hole after the tree removal- Strip and stain or seal the deck
- Replace rotten and warped boards
- Add wide stairs that align with future kitchen French doors
- Build a pergola near the back of the house
- Create outdoor seating and dining areas
– The Backyard (0% Complete) –

To do:
- Clear slate pieces, aerate, and reseed the lawn
- Transplant shrubs and layout plantings for better composition
- Plant privacy holly bushes along the property line (Phase 1)
- Build a wooden playhouse tucked into the woods for Clara
- Plant an edible garden and add a swing set
- Repair the cracked concrete walkway between garage and deck
- Add layered privacy plantings and hardscaping (Phase 2)
- Build raised planters, create a patio, and craft a wooden lean-to hideaway with climbing vines
- Build a wood cover for the air conditioner
We don’t expect to finish everything at once. Renovation is our favorite hobby, and we enjoy the process as much as the end result. We move project to project based on mood and priority, unless safety or urgency dictates otherwise. Right now we’re planning to:
- Repaint the salmon-colored living room walls
- Whitewash the living room fireplace
- Strip and re-stain/seal the deck
- Refinish the foyer light in an oil-rubbed bronze finish
How do you manage long-term home projects—apps, a single running list, or a spreadsheet? We’d love to hear how you keep track and prioritize renovations.