Objectales

Popular

McListerson’s Letters: Updated Edition

featured 45385

Our Home Project To-Do List and Progress Update

Psst — If you’re curious what we did for Easter and what Clara found in her basket, see the details on Young House Life.

This post is long, so feel free to skim. We get a lot of questions about how we keep all our home projects organized. The short answer: one long running document. People kept asking to see it, so we updated and shared our current list. You may remember an earlier version—this is the refreshed, consolidated list with completed items crossed off and new projects added. At the end we added a simple percentage score to show how finished each area is.

Home project image

How We Use the List

We circle small tasks we want to tackle right away, cross things off as they’re finished, and keep a separate section for long-term projects and larger furnishings that require saving or more planning. Reviewing long-term items regularly helps us stay motivated to save for them, while ticking off small tasks keeps momentum and excitement for gradual improvements. We generally work on projects we feel like doing unless something urgent or safety-related jumps to the top.

Current To-Do (But Not All At Once)

  • Find vibrant patterned fabrics and DIY curtains for multiple rooms (living room, future dining room, office, playroom, guest room, etc.).
  • Paint many areas of the house over time — small hallway, sunroom, hall bathroom, guest bathroom, and other rooms as inspiration strikes. This is an ongoing whole-house color scheme effort.
  • Stencil the office walls.
  • Paint sections of the living room trim and beams (we gray-washed the beams and like the balance it creates).
  • Remove unnecessary bi-fold doors.
  • Frost the side door that looks into the kitchen.
  • Remove built-in shelves next to the living room fireplace.
  • Prime and paint kitchen paneling.
  • Redo the kitchen backsplash and update kitchen hardware.
  • Prime and paint the oak cabinets in the kitchen.
  • Refinish and reupholster a secondhand rocker.
  • Hang mirrors in the office to serve as dry-erase message boards and keep project notes visible.
  • Replace multiple light fixtures throughout the house and add recessed lighting and pendants where needed.
  • Refinish some exterior door hardware; interior doors will be next.
  • Frame and update the hall bathroom mirror and paint the vanity.
  • Hang a drapey curtain in front of the walk-in closet and organize closet and dresser storage.
  • Paint or otherwise finish the nursery and related closet stenciling.
  • Transform the area between the addition and the old house into an outdoor cutting garden and alfresco dining space with a deck.
  • Build cabinetry around the washer and dryer for mudroom function.
  • Paint the front door.
  • Remove an awkward mirror in the guest bathroom.
  • Refinish the sectional legs for a subtler look.
  • Frame porch columns to be chunkier and more in keeping with the house’s style.
  • Paint the exterior siding a moody gray and the trim crisp white; stain the concrete porch floor to improve curb appeal.
  • Plant evergreen trees for privacy and upgrade landscaping with curved beds, hydrangeas, and additional plantings.
  • Prune the magnolia that blocks the front of the house.
  • Create a framed gallery wall down the big hallway.
  • Update built-ins and cabinet hardware, and swap the guest bathroom medicine cabinet for a mirror.
  • Hang a grid of Ribba frames above the sectional.
  • Install a ceiling medallion in Clara’s nursery to cover ceiling cracks.
  • Update the vanity in the main bathroom and plan a second phase for a full refresh later.
  • Paint the kitchen’s dark brick fireplace.
  • Add crown molding where needed (guest room, playroom, nursery).
  • Wallpaper or stencil a small space (tone-on-tone patterns planned for a hall bath or playroom).
  • Use chalkboard paint in a fun spot for the kids.
  • Stencil the inside of Clara’s closet and the ceiling for a subtle surprise.
  • DIY a sandbox or shallow baby pool for Clara.
  • Add organizational hooks and storage to the laundry room wall.
  • Make or source a longer bench for the foot of the bed.
  • Find or build a vintage hanging chair for the sunroom and add lanterns or paper pendants from the ceiling.
  • Build a formal compost bin.
  • Paint or disguise the rain barrel and plant around it.
  • Create raised beds for herbs, vegetables, and fruit.
  • Complete a beanbag reading nook in Clara’s closet.
  • Frame the mirrored bathroom door for a tidy look.
  • Add string lights on the patio and over a future deck; hang a swing from a backyard tree.
  • Modify the playroom daybed to add a trundle for sleepovers.
  • Build a play kitchen for Clara.
  • Build a dollhouse for Clara.
  • Paint large canvases to add color to unfinished rooms like the dining room, office, and playroom.
  • Hunt for thrifted bedside tables with drawers for the bedroom.
  • Recover or replace a worn leather parsons chair in the living room.
  • Add exterior patio lighting and possibly a clothesline for fresh air drying.

Long-Term Projects

  • Install a 300-square-foot paver patio on the side of the house.
  • Refinish wood floors throughout the house to a consistent shade for cohesion.
  • Investigate converting the kitchen fireplace into a double-sided feature that opens into the living room.
  • Create a larger opening between the kitchen and the future dining room.
  • Build a peninsula for an eat-in kitchen and more storage.
  • Convert the carport into a garage with an attractive garage door and added architectural detail.
  • Add French doors between the future dining room and office for charm and privacy.
  • Replace kitchen and mudroom flooring with cork.
  • Add a trellis arch around the new garage door for a lush entrance.
  • Build a deck (spring project) and a swingset for Clara.
  • Consider changing the roofline out front for more dimension and cohesion with the back of the house.
  • Think about a pool or a sunken trampoline someday (ambitious ideas to discuss).
  • Eventually transition Clara to the playroom as her big-kid room, keeping the nursery ready for future possibilities.

Furnishings to Save For

  • Queen-sized bed for our bedroom (so we stop sleeping on a mattress on the floor).
  • Large charcoal gray U-shaped sectional for the living room.
  • Dressers and other thrifted or refinished furniture we can restore to fit our style.
  • A larger TV stand or media center, ideally thrifted or DIY.
  • Oversized rugs for the living room and bedroom.
  • Stools for the kitchen peninsula (we found industrial-style stools at a local shop).
  • Round wooden pedestal dining table and upholstered chairs for the future dining room.
  • New towels, bath linens, and shower curtains for bathrooms.
  • Energy-efficient kitchen and laundry appliances as deals become available.
  • Guest room bed and furnishings.
  • New console table for the entryway and patio furniture for outdoor spaces.
  • Large armoire or tall cabinet for a bedroom nook and a substantial outdoor dining table for the deck.
  • A show-stopping chandelier for the dining area, possibly a DIY project.

Room-by-Room Progress

  • Front Yard: 15% complete — painted the door, pruned the magnolia, removed hiding bushes; landscaping remains.
  • Carport: 0% complete — planning to convert it to a garage eventually.
  • Living Room: 70% complete — large furniture and major pieces in place, but walls and media storage remain.
  • Office: 75% complete — functional with built-ins and seating; needs a rug and window treatments.
  • Hall Bathroom: 5% complete — a few tweaks made; much left to do for a full refresh.
  • Big Hallway: 90% complete — happy with the gallery and console; maybe add a runner later.
  • Small Hallway: 0% complete — plans for wainscoting, crown, lighting, and floors.
  • Dining Room: 50% complete — table and built-ins are good; entryway and lighting still undone.
  • Laundry Room: 90% complete — one of the most finished spaces.
  • Kitchen: 85% complete — new floor and painted cabinets done; trim, transitions, and textiles remain.
  • Playroom: 0% complete — currently full of items that need clearing before improvements begin.
  • Clara’s Room: 80% complete — mostly done, with future refinements possible.
  • Sunroom: 0% complete — needs clearing and a plan for furniture and finishes.
  • Our Bedroom: 35% complete — waiting on inspiration for a layout and finish choices.
  • Our Bathroom: 80% complete — close to finished now with plans for a Phase 2 retile.
  • Guest Bedroom: 60% complete — painted and furnished with leftover pieces; more styling planned.
  • Guest Bathroom: 5% complete — basic updates in place; more to do.
  • Basement Workshop: 0% complete — needs major decluttering and organization.
  • Side Lot: 2% complete — aiming to naturalize into an orchard-like space.
  • Deck: 2% complete — research phase, then permits and build.
  • Patio: 60% complete — patio area finished; planting beds and details remain.
  • Backyard: 0% complete — full overhaul needed in time.

We’ll tackle much of this over the coming years—our first house took 4.5 years to feel finished—so no rush. We try to enjoy the process, take projects one at a time, and celebrate small wins. Crossing items off the list is a great motivator.

Psst — see our floor plan post for more clarity on layout changes and our Current House page to view many completed projects.

Psssst — adorable “I heart lists” stationery inspired our planning notebooks.