After 330 days of living with a dark, closed-off kitchen, natural light is finally pouring into the space—and the change is incredible.

img 42111 1

This job took our licensed contractor Steve and his skilled assistant Tara nearly seven hours. (If you want the backstory on why we hired professionals, how we found them, and what permits were involved, see the original post here.) While they worked, John, Clara, and Burger stayed at his sister’s to avoid the dust and noise, and I stayed home to answer questions, hand out snacks, and watch them transform the space. Their careful, efficient work left us with a raw but unbelievably exciting result: a wide new opening that brings daylight and a whole new feeling to the kitchen.

Here’s a clear, straightforward account of how the opening was created. This is a simplified recap, not a how-to guide—this was handled by licensed professionals for safety and structural reasons. First, Steve and Tara used a power saw to cut the doorway opening into the kitchen’s wood paneling. The first surprise was that there was no drywall or plaster behind the panels—just studs—so we were relieved we had painted the existing paneling a while back instead of tearing it down in hopes of finding drywall. You can read more about that decision here.

img 42111 2

With the wall opened up, the electrician was able to inspect the wiring and make any necessary adjustments while the work continued. On the other side of the wall, Steve and Tara cut through two layers of drywall. As soon as that drywall came down, sunlight streamed into the kitchen and I admit I got a little emotional—happy tears were involved.

img 42111 3

We had already consulted an HVAC professional about the vents in that wall to ensure removing them wouldn’t harm the system. With the HVAC tech’s approval, John went into the crawl space, disconnected and capped the ducts, and confirmed that the visible vents would no longer be connected. We’ve handled this same step in a previous kitchen remodel, so we knew what to expect.

img 42111 4

To maintain structural integrity, Steve and Tara framed two temporary support walls while they installed a new header above the opening and reinforced the structure from the crawl space below. They worked carefully to make sure the opening would be secure and level.

img 42111 5

Peering through the framing at the yard beyond—green grass, leaves, and daylight—felt like a small revelation. For months our kitchen had been isolated from the outdoors; now it feels connected and welcoming.

img 42111 6

From the dining room side you can see the large wooden header and the drywall that will need patching above the new opening. Steve and Tara prioritized doing the header work from that side because drywall is easier to patch discreetly than the old wood paneling on the kitchen side. Smart planning like that will help everything look seamless once the finishing work is complete. They also built the short half-wall that the peninsula will sit against before wrapping up for the day. Here’s the scene as they packed up:

img 42111 7

My favorite view is now open to the front yard magnolia, which acts like a canopy and brings filtered light right into the kitchen. It already feels brighter, warmer, and more inviting—like a small tropical getaway. We’re clearly overjoyed: light has transformed the room.

img 42111 8

Notice the electrical outlet reinstalled near the right side of the new half-wall. Once the peninsula is in place most of that wall will be covered, but the 12″ countertop overhang will leave about a foot of wall exposed—an ideal spot for an outlet to power laptops or small appliances.

When John returned home we joked that the fireplace might need sunscreen now that it gets direct sunlight. The space still looks unfinished in places, but Steve and Tara finished their scope of work—so I wrote their $700 check and they headed off. Now the remaining tasks fall to us:

  • drywall, mud, and sand the half-wall and the area above the opening on the dining room side where header work was done
  • install a door jamb, add a wooden ledge over the half-wall, and fit trim
  • prime and paint walls, jambs, baseboards, and trim for a seamless finish

Even at this stage it’s easy to imagine the final kitchen: two or three pendant lights over the peninsula, a large chandelier above the dining table, painted cabinets and stainless-steel appliances, rich mocha cork flooring, and a cozy chair by the fireplace. The half-wall looks a bit odd without the peninsula, but once the countertop and cabinets are in place the space will start to feel complete. We’re already underway with drywall work and hope to share the next update soon.

img 42111 9

img 42111 10

To remind you how dramatic the change is, here’s a before shot taken from a similar angle on move-in day last December:

img 42111 11

It’s a dramatic improvement, and we’re aiming to complete the full kitchen overhaul in the coming months—possibly by January. There are still many steps ahead: removing and selling the old counters, installing new countertops, creating or sourcing matching doors for the new peninsula cabinetry, priming and painting all cabinet faces, installing a full backsplash, building a range hood, adding open shelving, and laying cork flooring ourselves. It’s a big project, but we love the challenge—and most of all, we love the light. This update already makes the kitchen feel like a happier, brighter place. Oh happy day.