Prep, Level and Install a Paver Patio: Step by Step
Digging has officially moved into the category of things I can do without. I expected a lot of it when we decided to DIY our patio, but after pulling up that liriope last week so easily, I got cocky. Turns out, that was premature confidence.

Next on the list was removing the old brick path. Some of the edge bricks were loose, so I figured, “How hard can it be?” That’s the exact moment I jinxed myself. The universe has a funny sense of humor.

At first the bricks came up easily because the front half had just been laid in sand. I would slip the shovel under the edge, pry, and entire rows would lift out. That initial success lulled me into the dangerous “this’ll be easy” mindset.

Then I hit a literal roadblock. The back half of the path was mortared into concrete. At first a few solid swings with a sledgehammer and some prying did the trick, but eventually the concrete got thicker and more stubborn the further I went.

By the time I’d pried up, smashed, and carried away all the bricks—stacking them neatly in the carport for a future project—I was beat. Ten feet of concrete still needed removing. I briefly considered renting a demolition hammer, but decided to give the sledgehammer one more shot.
Miraculously, the concrete shattered.

That lucky break gave me a second wind and I kept at it. As I worked, the concrete layer kept getting thicker—what began as an inch or so grew to about six inches in places, likely used to level a much steeper slope beneath it. At one point I even found myself taunting the concrete to psych myself up, resorting to geeky chants like “By the hammer of Thor!” Oddly enough, it helped push me through, and by the end of the day the concrete was broken up.

Technically the concrete was out but not hauled away yet. I saved that task for the next day and piled the rubble behind some trees on our property until I had the energy to deal with it.
My sledgehammer work wasn’t finished. The bottom step of an old brick staircase sat about two inches too high and would interfere with the patio perimeter. A second day of demolition reduced those bricks to rubble—Thor-style victory achieved.

With the area cleared of plants and bricks, we were finally ready to begin preparing the base for the paver patio. I followed a recommended patio installation guide and combined that advice with tips from local paver installers who corroborated the steps. The next phase required about $40 worth of supplies—wood stakes, a line level, mason string, and a hand tamper—plus tools we already owned like gloves, a yardstick, scissors, and a shovel.

Before digging, I staked out the patio perimeter to establish the final height and the slope. We’d previously outlined the shape with a hose: mostly straight edges with a gentle curve on the back. I drove stakes into the perimeter corners and turns—deep enough that they wouldn’t pull out while I dug around them.

Next I strung nylon mason lines between the stakes. The goal is to mark where the top of the pavers will sit and to ensure the finished surface slopes away from the house—about one inch down for every four feet is a good rule of thumb. I used a line level to make sure the strings were exactly level before marking the drop for the required slope.

Because my patio is curved and the yard is already sloped toward the house, stringing took longer than the flat, square example in the video. I had to line up the new patio with existing features—the carport, deck stairs, and fence—while fighting the pre-existing terrain so the final surface would drain properly away from the foundation.

In addition to the perimeter strings, I ran cross strings across the patio to monitor the slope and to provide reference points while digging. That helps prevent a patio that’s level at the edges but dips or bulges in the middle.

No, my dog couldn’t actually help with the line level, although he offered moral support (and the occasional mud-smudged face lick). For accuracy, a simple two-pack line level is cheap and effective.

I don’t have many photos of the digging itself because it was a repetitive grind of measure, dig, haul dirt, check the level, dig some more, rest for water, and repeat. It took about a day and a half—roughly six hours total—to lower the area about 6 3/8 inches below my strings. That depth allows for 3 inches of compacted gravel, 1 inch of sand, and about 2 3/8 inches of paver thickness so the finished patio sits flush with the surrounding surfaces.

After digging, I double-checked the slope and went to work tamping the base with a hand tamper. Renting a plate compactor would have been easier, but I wanted to keep my cross-guide strings in place and manual tamping did the job. It was brutal on the back, but after a few hours the soil was compacted and stable within a very small margin.

If this sounds like a bit of complaining, it’s only because digging and tamping are more exhausting than I expected. That said, I’m happy to have the hard part behind me. Now the next step is spreading and leveling the gravel and sand that arrived this morning, followed by laying the pavers. I’ll spare you the boastful part of my ego and instead share the amusing warning printed on our new wheelbarrow tire: apparently it’s not rated for interstate speeds.

If you’re up for a little manual labor and some company, hauling and leveling the gravel and sand would be a huge help. Otherwise, I’ll don my Thor pants and keep smashing forward. More updates soon as we move on to gravel, sand, and pavers.