Objectales

Popular

How to Fix a Deck That Failed a Building Inspection

featured 48269

When our first deck footing inspection didn’t pass, the next logical step was to dig more holes. That post explains the earlier setback, but the short version is that our original plan—anchoring ledger boards to the house—wasn’t acceptable to the inspector, so we had to change course and build a freestanding deck. That change meant adding seven new footings, bringing the total to twelve (five of my earlier holes were still usable, one was not).

Concrete slab discovery during deck footing digging

We’d already learned that digging holes by hand is tough but manageable, so we weren’t overly intimidated. After the first round—when my dad and I ended the day exhausted and soaked in sweat—I felt bad asking him to do a second round of heavy labor. Still, digging seven holes was more reasonable than doing all twelve at once, even though it meant another rental of the auger from Home Depot if we hadn’t borrowed one.

Deck footing holes marked out

For this round we borrowed both the 8″ and the 12″ auger bits since our footings need to be 12″ wide. Using the 8″ last time had meant extra manual widening, so we hoped the larger bit would speed the work. Things looked straightforward at first, until a surprise showed up beneath the soil.

Removing concrete slab discovered while digging

With my shovel I struck something solid in the first starter hole. Initially I suspected a root or brick, but we soon uncovered a roughly 6″-thick concrete slab—likely an old stair landing. It was too thick to break with our sledgehammer and nearly too heavy to move, but by sliding boards under it and levering, my dad and I shifted it just enough to place the auger in the correct spot. Moving that slab was tiring, and we hadn’t even begun drilling yet.

Shoving boards under slab to lift

Once the slab was out of the way, we fired up the auger. The 12″ bit was heavier and required a bit more control, but it eliminated the need to manually widen holes, which saved time and effort. We were able to reach the 21″ depth required in our area more quickly than before, and the result was consistent, properly sized footings.

Using the auger to dig deck footings

Auger in action drilling a footing

Clearing out dirt from auger holes

We still used a manual digger to remove loose material left by the auger, and yes, I made a few faces for the camera while my wife documented the process—got to keep it entertaining. All told, digging the seven holes, including dealing with the unexpected concrete, took roughly 90 minutes. We were less fatigued than the first time; whether that was due to cooler weather or the fact we’d already built some muscle from the previous round, it was a welcome improvement.

Completed augered footings ready for inspection

Posing beside the dug footings

With the holes ready, we scheduled a re-inspection and waited nervously. Failing again was a real concern, so I lost a little sleep the night before. Fortunately, the inspection went quickly and smoothly. A different inspector came out, looked over our updated plans and the new holes, and said “looks good.” No re-measuring, no additional comments—just approval. The visit was so fast my wife barely had a moment to snap a photo.

Inspection approval for deck footings

Celebrating inspection pass

After the inspector approved the footings, I confirmed a few details: importantly, he agreed we could keep the ledger boards we’d already installed and use them as rim boards for perimeter attachment. They won’t carry the load—the posts will—but they’ll help secure the deck’s perimeter. That was a huge relief because it meant we didn’t have to remove the ledgers or re-side that section of the house. I do need to counterflash the top of the ledger boards to protect against water intrusion, which I had planned to do anyway.

Happy to pass deck inspection

Next steps: order additional materials—posts and girder boards—and begin framing the freestanding deck. We’re optimistic about finishing in time for family meals on the deck this summer. Thanks to everyone who shared their setback stories last week; hearing about other people’s experiences really helped. What about you—have you recently turned a frustrating project into a win, at home or otherwise?

P.S. Thanks to everyone who checked in after the fierce storm we had on Friday night. We lost power until Sunday afternoon and experienced some scary winds, but our house escaped damage and power has been restored. Big appreciation to the crews who helped get things back on.