Warning: this post is longer than a short TV recap, so feel free to skim or read it in small bites. This to-do list started because readers kept asking how we organize everything we want to do around the house. We realized our system is basically one long running document, and after many requests to share and update it, we decided to clean it up and present it room-by-room. For each area I’ve separated what’s finished from what’s still on the list and included a rough completion percentage at the top of each section. Here’s the organized, updated house project list.
– The Front Yard (25% complete) –

Done:
- Pruned the magnolia and removed overgrown bushes that hid the house.
- Updated several garden beds and added new landscaping.
To Do:
- Transplant, plant, and trim remaining beds (we’ve addressed about three of ten garden beds so far).
- Adjust the front roofline—add peaks for visual interest and to better match the house’s rear profile.
– The Front Porch / House Facade (35% complete) –

Done:
- Furnished with pieces from our previous porch.
- Planted shrubs and flowers and painted the front door yellow.
To Do:
- Frame porch columns to make them chunky and square.
- Stain the concrete porch floor for a finished look.
- Paint the siding a moody gray and trim a crisp white.
- Add window boxes and shutters to side and back windows.
– The Carport / Garage (0% complete) –

Done:
- None yet.
To Do:
- Convert the carport into a garage once we finalize window/door details.
- Add a trellis arch around the new garage door for a lush look.
- Replace the light fixture with a larger, lantern-style fixture.
– The Living Room (70% complete) –

Done:
- Painted the walls, hung curtains, and gray-washed the ceiling beams.
- Added a new sectional, a large rug, and built a console.
- Upgraded to a larger TV.
To Do:
- Fill bare walls with art and add furniture near the kitchen corners.
- DIY or upcycle a larger media cabinet for the TV and add an armoire or tall bookcase near the sofa.
- Install French doors (three in total, including the hall door to the deck).
- Convert the kitchen fireplace to a double-sided unit opening into the living room.
- Create a coffered ceiling from the existing beams and refinish floors in the future.
– The Office (85% complete) –

Done:
- Built a custom desk, painted and upholstered secondhand chairs, stenciled the walls, and updated the chandelier.
- Added a chair and file cabinet for function.
To Do:
- Add wall decor, window treatments, and French doors between the dining room and office.
- Refinish floors eventually.
– Hall Bathroom (5% complete) –

Done:
- Raised the shower curtain, added window trim, and installed a new light above the mirror.
To Do:
- Paint walls, frame the mirror, hang art, and update the vanity and hardware.
- Add a window treatment, replace or refinish door hardware, and accessorize.
– Big Hallway (90% complete) –

Done:
- Installed a framed photo collage and a console table—happy with the current layout.
To Do:
- Add a patterned runner and refinish the floors down the line.
– Small Hallway (0% complete) –

Done:
- None yet.
To Do:
- Install wainscoting, crown molding, and new light fixtures; consider wallpaper above the wainscoting.
- Hang art, replace hollow-core doors with solid paneled ones, update door hardware, and refinish floors.
– Dining Room (70% complete) –

Done:
- Painted walls, updated built-ins with dark teal backs, made curtains, and added a large round table and art.
To Do:
- Define the entry area with art and furnishings, personalize yard-sale art over the buffet, and install a statement light over the table.
- Upgrade chairs, build a giant lazy Susan for the center of the table, and refinish the floors.
– Laundry Room (95% complete) –

Done:
- Painted walls, removed shutters, frosted the glass door, painted cabinets, replaced appliances, added built-ins, and installed cork flooring.
- Added art, a clothespin chandelier, and a wall iron board holder.
To Do:
- Possibly add a window treatment.
– Kitchen (85% complete) –

Done:
- Primed and painted paneling, painted the brick fireplace, replaced appliances with stainless, opened the kitchen to the dining room, and updated lighting.
- Rearranged cabinets, painted them with new hardware, installed white Corian counters, tiled a backsplash to the ceiling, added floating shelves, built a microwave cabinet, installed a range hood, and used dark cork flooring.
- Added stools, art, and a rug for the sitting area.
To Do:
- Finish the peninsula back with trim, add window treatments over the sink, and consider a message board on the pantry side.
- Beef up crown molding, finish the fireplace surround with a chunky wood mantel and tile, and consider repainting walls or adjusting the hood design.
- Add trim to cabinet tops and continue making the sitting area cozier.
– Playroom (0% complete) –

Done:
- None yet—room is currently full of book projects and storage until the book cycle is complete.
To Do:
- Clear the room, then paint, furnish, and accessorize. Plan to retrofit a built-in-style daybed with a trundle for sleepovers.
- Update door hardware and refinish floors in the future.
– Clara’s Room (80% complete) –

Done:
- Painted walls, hung curtains and art, moved in furniture, installed a sentimental capiz chandelier, built a play kitchen, and created a cozy closet nook.
To Do:
- Add more art, crown molding, and ceiling detailing; refinish floors and update door hardware.
- Room layout may evolve if Clara moves to a different bedroom in the future.
– Sunroom (0% complete) –

Done:
- Furniture from the previous house was placed temporarily; the room is holding storage for book projects.
To Do:
- Paint walls, whitewash brick, furnish with existing pieces, add window treatments, and upgrade the fan or install a new light.
- Replace the doors with French doors, add shelving or built-ins, hang art, and consider a fun ceiling treatment to suit the sloped roof.
- Eventually replace the beige tile flooring.
– Our Bedroom (60% complete) –

Done:
- Removed dated bifold doors, added a mirror over the sink window, removed an off-center medicine cabinet, replaced the bed, repainted walls, and installed a playful chandelier.
- Hung curtains, rearranged furniture, and made an upholstered headboard.
To Do:
- Convert the deck-facing window into a French door, add furniture for bare walls, and possibly raise the ceiling to follow the roofline.
- Update the sink vanity, consider tiling the sink nook back wall, add a larger bench at the foot of the bed, install French doors into the sink nook, and refinish floors.
- Replace or refinish door hardware and upgrade closet finishes.
– Our Bathroom (75% complete) –

Done:
- Raised the shower curtain to ceiling height, painted walls, hung art, refreshed trim, frosted the window, replaced the toilet, and updated lighting and tile to white glass subway.
To Do:
- Phase two will include retiling the floor (we’re considering gray hex tiles) and possibly reglazing beige tile to bright white.
- Update door hardware.
– Guest Bedroom (60% complete) –

Done:
- Painted and furnished the room with existing pieces, and added curtains and a mirror.
To Do:
- Add crown molding, hang art, update the mirror finish, replace worn furnishings, update door hardware, and refinish floors.
– Guest Bathroom (5% complete) –

Done:
- Removed an awkward mirror on the door, installed a new shower curtain and bath mat, hung art, and updated the mirror and light fixture.
To Do:
- Paint, consider replacing tile, install a glass shower door, frost the window, update door hardware, and add more art to bare walls.
– Basement Workshop (0% complete) –

Done:
- None yet.
To Do:
- Clear the clutter, organize tools and storage, paint or finish the concrete floor, and create a functional workshop space.
– Side Lot (10% complete) –

Done:
- Planted two trees.
To Do:
- Plant more trees and naturalize the area into a small orchard rather than a weed-and-leaf patch.
– Deck (60% complete) –

Done:
- Cleared plants, designed and permitted the deck, removed the old balcony, framed and installed deck boards.
To Do:
- Finish railings and steps, furnish with dining furniture and planters, add a pergola or string lights, plant screening greenery, and create a paver patio for the barbecue.
– Patio (70% complete) –

Done:
- Cleared the space, purchased materials, leveled and laid gravel and pavers, created custom edging, landscaped around the patio, and built a rock box and rain barrel for play and water conservation.
To Do:
- Furnish the patio, add string or fence lighting, and install play features like an outdoor chalkboard or slide for Clara.
– Backyard (0% complete) –

Done:
- Built a compost bin.
To Do:
- Remove invasive ivy, clear overgrown beds, increase grassy play areas, remove a purposeless brick path, plant privacy trees, add raised vegetable and herb beds, transplant shrubs, reseed dead grass, paint the basement door, build a swingset and a shed, hang a tree swing, and consider a modest in-ground saltwater pool as a long-term dream.
We expect to tackle many of these projects over the next several years (our first house took 4.5 years), so we try to enjoy the process and cross things off a little at a time. We don’t follow a strict project order—apart from urgent safety fixes, we usually pick what we’re in the mood for so we stay motivated. Big projects tend to simmer in the background until we’re ready to commit, while smaller tasks give quick wins. How do you organize your home projects—on your phone, a paper list, or something else? What’s your method for choosing the next task?
For reference, we also maintain a floor plan and a photo gallery that show many of the layout changes and completed projects mentioned above.