Warning: this is longer than the Oscars, so feel free to fast forward to the sections you care about. This post started because people kept asking how we organize all the projects on our home to-do list. Our approach is simple: one long, live document that tracks what’s done and what’s still pending. We split each room into a completed list and a to-do list and include a percentage at the top of each area to show roughly how far along it is. Below is an updated, room-by-room progress report on our home renovation and improvement projects.

The Front Yard — 40% complete

img 55737 1

Completed:

  • Limbed up the magnolia so it no longer blocks the house.
  • Removed overgrown bushes that hid the façade and opened sight lines to the house.
  • Planted grass in the bare patches created by removing shrubs.
  • Updated several garden beds and added new landscaping elements.

To do:

  • Transplant, plant, and trim additional plants—three beds are done, but several more need attention.

The Front Porch and House Facade — 35% complete

img 55737 2

Completed:

  • Furnished the porch with pieces saved from our previous house.
  • Planted shrubs and flowers to soften the entry.
  • Painted the front door a cheerful yellow.

To do:

  • Frame out the porch columns so they are chunky and square rather than ornate and curvy.
  • Stain the concrete porch floor for a finished look.
  • Add window boxes around the house and install shutters on side and back windows where they’re missing.

The Carport/Garage — 5% complete

img 55737 3

Completed:

  • Replaced the small light fixture with a larger black lantern.

To do:

  • Decide between converting the space into a closed garage or beefing up the columns and adding a covered trellis/pergola to keep it airy and light.

The Living Room — 85% complete

img 55737 4

Completed:

  • Painted the walls and refreshed the trim that was previously dark wood.
  • Gray-washed exposed beams for a softer look.
  • Added a new sectional we love and built a console to sit behind it.
  • Hung subtle patterned curtains, replaced the rug, ottoman, and a desk chair, and upgraded to a larger secondhand media cabinet.
  • Built a leaning chalkboard near the back of the room to balance the tall sliding door.

To do:

  • Add overhead lighting (a pendant over the table area and possibly recessed cans).
  • Consider converting the kitchen fireplace into a double-sided unit that opens into the living room.
  • Refinish the floors in the future.

The Office — 85% complete

img 55737 5

Completed:

  • Built a custom double desk and organized the workspace for two.
  • Painted and reupholstered secondhand chairs for color and comfort.
  • Stenciled and painted the walls, added sentimental art, and replaced the old chandelier with an updated fixture and large shade.
  • Added functional storage like a file cabinet to increase usability.

To do:

  • Add window treatments—bamboo blinds are being considered for texture.
  • Install French doors between the dining room and office for privacy and architectural interest.
  • Refinish the floors at a later date.

The Hall Bathroom — 100% complete

img 55737 6

Completed:

  • Hung the shower curtain higher, added window trim to balance the space, installed a new light above the mirror, and painted the walls.
  • Framed the mirror, added art and a chunky shelf, updated vanity knobs, and installed a handmade window shade.

To do:

  • Nothing major for now—this space is considered complete.

The Big Hallway — 90% complete

img 55737 7

Completed:

  • Installed a frame collage and a console table that we love, so no major changes are planned.

To do:

  • Consider a patterned runner and eventually refinishing the floors.

The Small Hallway — 5% complete

img 55737 8

Completed:

  • Spray painted the old door knobs in an oil-rubbed bronze finish; they’re still holding up well.

To do:

  • Add board and batten, paint the walls, install crown molding, hang art, replace the old light and doorbell chime, and eventually refinish the floors.

The Dining Room — 95% complete

img 55737 9

Completed:

  • Painted the walls, finished the built-ins with a dark teal back wall, hung homemade curtains, and brought in a large round dining table and chairs.
  • Added a chippy painted buffet, personalized yard-sale art, and installed a show-stopping light fixture over the table.

To do:

  • Build a large lazy Susan for the table’s center and, down the line, refinish the floors.

The Laundry Room — 98% complete

img 55737 10

Completed:

  • Painted the walls, removed old shutters, frosted the glass side door, painted cabinets, replaced hardware, and upgraded to energy-efficient appliances.
  • Built custom shelves, replaced laminate with cork flooring, hung art, crafted a clothespin chandelier, and mounted the ironing board on the wall.

To do:

  • Possibly add a simple window treatment; this room is nearly finished.

The Kitchen — 85% complete

img 55737 11

Completed:

  • Painted the brick fireplace, primed and painted paneling, replaced mismatched appliances with stainless models, and opened a big pass-through to the dining room.
  • Updated lighting with can lights and pendants, rearranged cabinetry, painted cabinets and hardware, installed white Corian counters, tiled a full backsplash, and added open shelving.
  • Built a ventilated microwave cabinet, installed a range hood and cover, replaced flooring with dark cork, and added stools and a rug to define the sitting area.

To do:

  • Finish the back of the peninsula with trim, consider a message board on the pantry side, decide on crown trim for the cabinets, possibly repaint walls, and eventually reface the fireplace surround.

Playroom / Big Girl Room — 75% complete

img 55737 12

Completed:

  • Cleared clutter via a yard sale and donations, painted the walls, made and hung curtains, added a rug, and brought in a kid-sized table and storage-friendly dresser.
  • Switched to a pendant light, created a meaningful frame collage, hung decorative birdcages, and cleared the closet for toy storage and play use.

To do:

  • Paint the ceiling, add crown molding, refinish or repaint the dresser, and refinish the floors later.

Nursery — 90% complete

img 55737 13

Completed:

  • Painted the walls, hung curtains, moved in existing furniture, hung art and baskets, and installed a sentimental capiz chandelier.
  • Built a play kitchen and fridge, restyled the closet with stamped walls and a sewn beanbag reading nook.

To do:

  • Hang additional art, add crown molding, and eventually refinish the floors. The room will likely evolve if it becomes a nursery for a future child (we’re not expecting one right now).

The Sunroom — 60% complete

img 55737 14

Completed:

  • Spray painted hardware in an oil-rubbed bronze finish, painted walls and the odd brick feature, furnished the room with existing pieces, added art, and brought in a bookcase for storage.

To do:

  • Furnish a few bare corners, add window treatments, and eventually replace the dated beige tile flooring.

Our Bedroom — 80% complete

img 55737 15

Completed:

  • Removed dated bifold doors, installed a mirror over the sink, removed a granite backsplash to streamline the sink nook, and added a new bed and upholstered headboard.
  • Repainted walls, replaced the fan with a playful chandelier, added curtains and art, rearranged furniture for better flow, and furnished a previously bare wall.

To do:

  • Consider converting a window to a French door, tile the sink nook back wall someday, and refinish the floors in the future.

Our Bathroom — 75% complete

img 55737 16

Completed:

  • Hung the shower curtain at ceiling height, painted the walls, added art, refinished trim, frosted the window for privacy, replaced the toilet, installed a centered glass pendant, and replaced dated border tile with white frosted glass subway tile.

To do:

  • Phase two may include retiling the floor—possibly gray hex tiles—and brightening the beige wall tile by reglazing or covering with beadboard.

Guest Bedroom — 70% complete

img 55737 17

Completed:

  • Primed and painted the walls, furnished the room mostly with leftover pieces, and hung curtains and a mirror.

To do:

  • Hang more art, add crown molding, repaint or replace the round mirror, upgrade worn furnishings, and eventually refinish the floors.

Guest Bathroom — 10% complete

img 55737 18

Completed:

  • Removed an awkward mirror on the back of the door, installed a shower curtain and bath mat, added art and a new mirror over the sink, and replaced the light fixture.

To do:

  • Paint the walls, decide on tile upgrades, install a glass shower door, frost the window for privacy, and hang more art to finish the room.

Basement Workshop — 85% complete

img 55737 19

Completed:

  • Cleared a huge mess by donating and hauling away debris, organized tools on framed pegboards, stored paint in a built-in cabinet, and sorted screws and nails into jars on shelving for easy access.
  • Added sawdust-proof art and functional shelving above the main workspace.

To do:

  • Paint the basement door and consider staining the floor and work counters for a finished workshop look.

The Side Lot — 10% complete

img 55737 20

Completed:

  • Planted two trees to begin naturalizing the area.

To do:

  • Plant many more trees and convert the weed-covered lot into a naturalized orchard-style space.

The Deck — 80% complete

img 55737 21

Completed:

  • Cleared obstructing shrubs, mapped and permitted a deck plan, demo’d the old balcony, dug post holes, framed the deck, and completed deck boards, railing, and steps.
  • Furnished the deck and installed a new French door to replace a rotten exit.

To do:

  • Stain and seal the deck, add oversized string lights, conceal the utility box, and plant screening greenery around the steps and AC unit.

The Patio — 85% complete

img 55737 22

Completed:

  • Cleared weeds and dead growth to make way for a patio, planned and purchased materials, leveled and laid gravel and sand, installed pavers with a custom curved edge, landscaped around the patio, and built a rock box and rain barrel for play and water savings.

To do:

  • Furnish the patio more fully and add lighting such as string lights around the fence or from trees.

The Backyard — 90% complete

img 55737 23

Completed:

  • Built a compost bin, cleared overgrown beds to create more lawn, removed invasive monkey grass from brick paths, transplanted misplaced bushes, and reseeded the grass.

To do:

  • Remove ivy choking large trees, plant trees along the rear property to naturalize for privacy, add raised vegetable and herb beds, and consider a swingset or rely on a nearby public playground.

img 55737 24

In summary, it’s satisfying to look back at everything we’ve accomplished, but the to-do list remains long. Our philosophy is to enjoy the journey, tackle projects that inspire us, and save big-ticket renovations until we feel confident in the plan. Crossing off smaller items keeps momentum going between larger projects. Right now, we’re thinking our next priorities will be adding crown molding to bedrooms that lack it, boxing in porch columns, reworking the carport, and renovating the untouched guest bathroom.

How do you manage your home renovation to-do list? Do you use a phone app, sticky notes, a shared online document, or an old-fashioned notebook? How do you decide what to tackle next—urgency, budget, mood, or a mix of all three? We’d love to hear about your process.