After nine months of steady work on the beach house, things suddenly feel like they’re happening at lightning speed. This update covers a lot of ground—trim and doors, tile work, plumbing and HVAC progress, and those satisfying little finishing touches that make a house feel like a home. The foyer photo below is a good kind of messy: organized chaos signaling real progress.

Compared to where we started—an unstable foundation, a leaky roof, rotting siding, and dated plumbing and electrical—this is a vast improvement. New HVAC, updated drywall free of mold and cracks, repaired foundation, and a tight, new roof have all made the house feel like a very different place.
Note: If you’re reading in a feed reader you may need to view the post on the site to see the video player.
One of the most visible changes has been installing trim and rehanging doors. Our contractor installed most of it while we were tiling, so photography caught things mid-process, but you can already see how much more finished the house looks with trim and doors in place.

We salvaged as much original trim as possible, but a lot was too decayed to reuse. To make the most visual impact with the pieces that survived, we kept original trim in the foyer, on all downstairs doorways, and around the stained glass windows on the stairs. The rest of the house received a simpler, chunky trim that fits with other restored homes in town.

Some readers asked why our contractor didn’t prime and paint the reclaimed trim before it was hung. Their approach is practical: hang all the pieces first, then caulk, and paint only the pieces that end up being used. That avoids multiple coats and wasted effort on trim that ends up being rejected for fit or condition.

Leaving pieces unpainted turned out to be a lucky decision. Seeing some of the muted original tones—like the soft gray on the stair trim and the pale blue-gray around a doorway—made us reconsider painting everything bright white. We’re now exploring using those softer tones selectively through the house instead of defaulting to white everywhere.
We also kept and rehung all the original doors. Although saving the doors cut the cost of buying new ones, it increased labor because each door required new jambs; pre-hung new doors would have been faster. The extra effort is worth it for the character these originals bring—our favorite is a chippy blue door between the mudroom and kitchen. We’ll keep it mostly open and simply clean and clear-coat it to preserve the aged finish.

Here’s that door in an early “before” photo from when we first bought the house—funny enough, our HVAC guy is visible behind the glass in the picture from when we had him out for an estimate.

Upstairs, we rehung the original wood doors that had been there previously. In the front bedroom we uncovered a cool brick chimney behind the walls and left that portion exposed in the living room below. (There’s still a hole to repair, but the exposed brick adds charm.)

We’re weighing what to do with the upstairs doors. They’re darker and more scratched than we remembered—more worn than characterful. Since the hallway has no windows, we worry they could make it feel dreary. Ideally we’d sand and clear-seal each one to bring them closer to the heart pine floors, but that’s time-consuming work. Painting some doors the soft gray from the foyer staircase is an option we’re considering while we let the house come together.

On the DIY front, we’ve been doing a lot of tiling. We spent two days—about 19 hours total—tiling four floors (three bathrooms and the attached mudroom), then returned to install three shower pans. We still have three shower walls and all the grouting to finish, but doing this work ourselves is saving over $12,000.

For the downstairs mudroom and bath floors we went with an affordable, durable 12×24 porcelain tile that has a slate-like look, and for the shower pan we used a basketweave tile. Shower walls will get extra-long white subway-style tiles for a clean, classic feel.

Upstairs, the hall bath uses a warm gray 12×24 porcelain tile with a softer, concrete-like look so the floor won’t read too dark in lower light. We paired the floor with a simple white hex shower pan and a patterned blue tile accent for the shower wall to add personality while keeping the overall scheme classic and appropriate for the house’s age.

We experimented with a couple of installation systems this time. Instead of cement board, our contractor recommended the orange Schluter system. We also used the LASH tile leveling system to avoid lippage with the large-format tiles. The LASH clips sit under tile edges and the wedges ensure adjacent tiles are the same height—then you snap the clips off after the setting time. It’s simple and saved a lot of time fussing over leveling.

The most time-consuming tiling was in the master bath. We laid classic black-and-white hex sheets but swapped the black floral/asterisk shapes for bright blue tiles to create a playful, retro-inspired floor and shower pan pattern.

Preparation took some time: we set up a “prep table” over a clawfoot tub where we removed black tiles from each hex sheet and separated out blue tiles to speed installation. We dry-fit the pattern first and ultimately decided on a staggered layout rather than a strict grid—the offset pattern felt more interesting.

We worked late into the evening on some days, using battery work lights and phone flashlights since the house didn’t yet have power. On a return trip we continued the tile pattern into the shower pan so it lines up visually with the rest of the floor—worth the extra effort to avoid a patchwork look once glass and grout are installed.

We’re planning to start the shower walls soon; the master is getting the same long white subway-style tile as downstairs. With the pace of work lately, we’ll see how quickly that comes together.
While we were there, Sherry also did a bit of initial cleaning on the original clawfoot tub. With just water and a sponge she removed a lot of surface deposits and dust, and even a rust spot revealed white cast iron underneath. We’re hoping a little more elbow grease will let us reuse the tub without reglazing—keeping the original basin would be ideal. The tub’s exterior can be primed and painted if needed.

Mechanically, we’re making big strides: the HVAC contractor installed the outdoor A/C units, so we’ll soon be able to cool the house. And the town installed our water meter, which means our plumber can connect us to running water—huge progress after the long saga of locating and repairing an ancient, misplaced water line that ran under neighboring yards.

At one point we were told connecting a new line could require digging up two roads and cost roughly $15,000. Fortunately, a city diagram hinted at a very old line near our property. After careful excavation the town found and repaired that line and installed the meter in front of our house, which was a big relief and saved us a major expense.

All in all, it’s the good kind of mess—work visible everywhere, the house moving from a project to something livable and lovely.
If you want to catch up on other beach house updates we’ve shared, check these posts:
- Drywall is up, and it’s glorious!
- Finding a vintage pink stove
- Stuff Sherry bought (way too early)
- The outside’s almost done & the inside’s getting good
- That time our beach house photobombed HGTV
- Walls up, walls down, and a new floor plan
- How we picked the exterior color
- Gathering beach house style inspiration
- Beach house “before” video & floor planning
- Holy seashells, we bought a beach house!
*This post contains affiliate links