Letters from Von Listerstein
These days, lazy mornings on the porch are pretty much my favorite thing to do. But for everyone who asked for an updated “Listy” post, here it is — an overdue check-in on what we’ve finished, what’s in progress, and what’s still on the list. We last shared an update in November, so this is a good moment to celebrate the progress we’ve made and to plan the next projects. We keep one long running to-do document that we update as we go, and sharing it a few times a year helps us see the big picture and stay motivated.
– The Front Yard (20% Complete) –

To do:
Remove the trees that are dead/decaying/diseased beyond repair (an arborist and a home inspector helped confirm which ones should go)Get all exterior siding and trim repaintedDig up all the quickly spreading ground cover(mulch beds remain to be done)Aerate, level, and seed the yard- Create planted beds in front, mulch and plant them
- Transplant crowded boxwoods on either side of the portico into better locations
- Redo the cracked concrete walkway from driveway to front door with curves and planting beds
- Add hardscaping — raised stone beds inspired by a favorite landscaping we love
- Plant a few small green dwarf maples
- Add low curved brick borders on either side of the driveway wired with lights
- Have the driveway paved
– The Portico (30% Complete) –

To do:
Repaint the portico and sidelightsPaint the front door- Arch the portico ceiling for a more elegant look
- Paint and panel the front triangular element once it’s reworked
- Add planters, a wider welcome mat, and updated porch lighting
– The Garage (3% Complete) –

To do:
Change out the tiny/rusty light over the garage doors(we tried a fix but may replace again)- Repaint garage doors and add hardware for a heavier look
- Add a pergola over the double garage doors with vines
- Finish the garage interior with drywall, build a workshop side and perimeter storage
- Reuse dinged kitchen cabinets for garage storage
- Redo the steps from garage to kitchen (remove old carpeting or rebuild)
- Build a rolling box for scrap wood storage
- Consider repurposed lockers painted fun colors for extra storage
- Possibly add plumbing for a utility sink
– The Foyer (80% Complete) –

To do:
Remove interior doors that block flow into the kitchenPaint blue trim, doors, and sidelightsRemove wallpaper and repaintReplace the foyer lightConvert the extra toy closet into a craft and toy closet for ClaraRepaint the foyer ceilingReplace grout and repair tile where needed- Replace tile only if it’s unsalvageable
- Turn the other foyer closet into a functional shoe/coat closet with built-ins
– The Stairs (90% Complete) –

To do:
Remove old carpet from wood stairsPaint blue railing spindles and trimStain top rails dark to match the runnerPaint walls and ceilingPaint stair risersInstall a new striped runner with rug pad- Hang art and consider a large chandelier to suit the lofted ceiling
– The Half Bathroom (35% Complete) –

To do:
Remove wallpaperRepaint blue trim and doorUpgrade door hardware and hingesPaint walls and vanity (with odor-blocking primer)Replace mirror with a larger optionUpgrade lighting and replace leaky faucet- Replace vanity and sink in a later phase
- Replace unsalvageable tile floor in a later phase
- Considering adding wallpaper or a tiled accent wall since there’s no tub/shower
– The Dining Room (10% Complete) –

To do:
Clean and reseal wood floors- Update built-ins (remove decorative tops, extend to ceiling, paint)
- Paint the remaining blue trim
Remove wallpaper- Repaint walls, upgrade lighting and curtains
- Add furniture, a rug, and art
– The Living Room (10% Complete) –

To do:
Clean and reseal wood floorsPrime and paint the bright pink walls and remove old curtainsWhitewash the brick fireplace wall- Prime and paint the wood wainscoting in white
- Decide on window treatments (bamboo blinds + curtains or printed roman shades)
- Add more recessed lighting for even illumination
- Consider converting overhead beams into a coffered ceiling
- Design a built-in cabinet to house the TV
- Save for gas logs and possible fireplace enhancements in Phase 2
– The Office (20% Complete) –

To do:
Take down old curtains and clean/re-seal the floorsPaint all blue trim, baseboards, crown and the wallsAdd a double desk that J and I can share- Add more storage—bookcases, file cabinets, and a craft/photography zone
- Get good desk chairs, add window treatments, hang art and a brainstorming wall
- Create a small kid zone for Clara and Teddy and add a cozy rug
Add two large potted plants
– The Kitchen (35% Complete) –

To do:
Remove curtains and wallpaperReconfigure shelving and move cabinet over the fridge forwardFind a table for the eat-in area and paint wallsUpdate kitchen lighting and paint doors and trimPaint/stain cabinets for now; they’ll be reused in the garage laterReplace the over-stove microwave with a vent and move the microwave to the pantryRefresh old appliances with affordable fixesOrganize and refinish the pantryUpdate counters with concrete and seal them- Consider peel-and-stick floor tile as a Phase 1 finish
- Full kitchen renovation planned for Phase 2 (heated floors, new cabinets, counters, appliances, backsplash)
- Convert the triple window behind the table into French doors to the deck
- Open the wall to the living room and add built-ins
- Upgrade the pantry with pullout drawers and improve the command center across from the windows
- Decide on paint color for new French doors and the sunroom door
– The Sunroom-Turned-Veranda (80% Complete) –

To do:
Remove old carpet, heater and damaged sliders; convert to an open covered porchLoft the ceiling and add beadboard painted soft blueRedo electrical and install two ceiling fansRetile the floor with outdoor-safe stone- Add sconces to the posts and conceal exposed wiring
- Furnish with deck-friendly outdoor furniture
- Consider building a brick outdoor fireplace after opening the space
– Our Bedroom (15% Complete) –

To do:
Replace old carpeting with hardwoods and repaint cream trim whiteInstall faux wood blinds for privacy and repaint the walls- Repaint or add texture to the ceiling (planking or wallpaper)
- Consider built-ins or window seats along the bed wall for more storage
- Add a ceiling fixture, art and curtains
- Long-term: add a fireplace if the stars align
– Our Bedroom Sink Nook (50% Complete) –

Remove carpet in sink area, replace mirror, paint, stencil and seal subfloorAdd simple shelves to balance the vanity and update hardware- Phase 2: full renovation to combine the sink nook with the adjacent bathroom
– Our Bathroom (30% Complete) –

To do:
Remove the glass shower door and replace window privacy with blindsRemove wallpaper and repaint walls, trim and ceiling- Replace the bathroom mirror and upgrade lighting
- Phase 2: expand and fully redo the attached bath — expand into the sink nook for a larger layout with a soaker tub, tiled shower and double sinks
– Our Closet (40% Complete) –

To do:
Repaint trim, paint walls and ceiling, remove carpet and stencil the subfloor- Phase 2: decide whether to extend bathroom tile or bedroom hardwoods into this space
- Install a new light fixture and build a custom storage system with drawers, shelves and varied hanging heights
– Upstairs Hallway (75% Complete) –

To do:
Replace carpeting with hardwoods, repaint trim and doors glossy whiteReplace hinges and doorknobs and upgrade the thermostatStain/paint the bannister and posts and replace hallway lights- Convert the linen closet to built-in open shelves or cabinets and add crown molding
- Consider adding wood wainscoting to break up the long space and hang art
– Clara’s Room (90% Complete) –

To do:
Replace carpeting with hardwoods, repaint trim, add blinds and curtainsPaint walls, add a canopy wall for Clara’s bed and paint her closet door bright pinkAdd crown molding, art and furnishings once the crib is moved- Turn the deep sloped-closet into a little playhouse and add a ceiling light fixture
– Nursery (90% Complete) –

To do:
Replace carpeting with hardwoods, repaint trim, add blinds and curtainsFurnish the room, install built-ins flanking the crib and add crown moldingFinish details: crib skirt, mobile, wall art and closet organization- Add a ceiling light fixture and line curtains with blackout fabric
– The Guest Bedroom (12% Complete) –

To do:
Replace carpeting with hardwoods and repaint trim/doorsOrganize the closet and clear out excess items- Paint walls and ceiling, add crown molding and a ceiling light
- Bring in a bed and a dresser/desk that can accommodate a sewing machine for a dual-purpose room
– The Hall Bathroom (8% Complete) –

To do:
- Paint trim, walls and ceiling
- Replace faucets, mirrors and lights as a Phase 1 refresh
- Phase 2: full redo for stained/cracked tile and leaking tub — exploring herringbone slate, marble or long rectangular tile
– Laundry Nook (20% Complete) –

To do:
Replace carpeting with hardwoods and upgrade washer & dryer to efficient modelsLay something stable under the washer and dryer (we used stained wood planks)- Redo the nook with new doors for noise control, updated cabinets/shelving, a tile backsplash and thoughtful lighting to create a small, polished laundry room
– Unfinished Storage Room (0% Complete) –

To do:
- For now this will be a large storage space. Long-term ideas include finishing it as a movie or bunk room: add drywall, flooring, lighting, bigger windows, built-out closets and built-in beds or lounge seating.
– General Whole House Ideas (7% Complete) –
To do:
- Upgrade all lighting to LEDs to save energy
- Replace gold, wallpapered or off-white switchplates and outlets throughout the house
- Gradually upgrade frames, drapes, sheets and curtain rods to raise the overall finish level
– The Back Deck (50% Complete) –

To do:
Remove a giant oak tree growing too close to the housePatch the deck hole after tree removalStrip, stain and seal the deck and replace rotten boards- Add double-wide stairs that align with future French doors from the kitchen
- Consider a pergola off the back of the house and build outdoor furniture
– The Backyard (15% Complete) –

To do:
Remove random slate pieces, aerate, level and seed the yardPlant large hollies for privacy- Transplant plants for better layout, reseed seasonally and add privacy plantings gradually
- Build a swing set, plant an edible garden, and repair the cracked concrete walkway
- Build raised planters and hardscaping, possibly add a patio, and create a wooden lean-to hideaway planted with vines
- Build an AC cover with wood boards
People often ask how we decide what to tackle next. We usually pick whatever sounds fun and fits our current budget, unless something urgent or safety-related forces a reprioritization. Jumping between small and large projects helps keep momentum — one week it’s painting cabinet doors, the next it’s updating counters or planting privacy trees.
Next on our immediate list: continue adding storage and function to the freshly painted office, finish up the nursery, organize and paint the guest room, remove blue trim in the dining room, and get back outside for privacy plantings when the weather warms up.
How about you? Is your to-do list long and detailed, or do you keep a short list of priority tasks? For us, writing everything down helps clear our heads and lets us focus on a few next projects while the rest waits in the background.